Deck posts usually rot at the base, where the wood sits in soil, mulch or standing water, and footings fail when they are too shallow for frost, too small for the load, or sitting on loose fill. A rotted post can often be replaced on its own: the deck is shored up, a new post goes onto a sound footing with a metal post base, and the beam is reconnected. The fix is bigger when several footings have moved. Our guide to deck repair and safety through Ohio seasons covers the rest of the structure.
Posts and footings are the part of a deck people look at least, yet they hold up everything else. Ohio jurisdictions around Cincinnati want deck footings dug past the frost line, a depth they each fix somewhere between 30 and 36 inches, and many older decks around Cincinnati were built before anyone checked. We are Building Character, a licensed Ohio builder working from Cleves since 1994, and replacing posts and resetting footings is a regular part of the structural repair work we do on older decks.
Posts and footings are the part of a deck people look at least, yet they hold up everything else. Ohio jurisdictions around Cincinnati want deck footings dug past the frost line, a depth they each fix somewhere between 30 and 36 inches, and many older decks around Cincinnati were built before anyone checked. We are Building Character, a licensed Ohio builder working from Cleves since 1994, and replacing posts and resetting footings is a regular part of the structural repair work we do on older decks.
Quick answer
9 min read
Where posts rotThe bottom few inches, at or below grade
Minimum post size (AWC DCA 6)6×6 nominal
Footing depth, Southwest OhioUnder the frost line: 30–36 in., varies by town
Kentucky and IndianaEach county’s building office sets the depth
Freeze-thaw swings per yearRoughly 57 in Cincinnati (NCEI)
RepairsConfirmed on site; a permit may be required
The most common post and footing problems
Most post and footing trouble falls into a handful of patterns, and you can spot several of them yourself with a flashlight, a level and a few minutes under the deck. Some are simply age. Others are shortcuts that were common when many tri-state decks went up and that current guidance no longer allows.
Post and footing problems we find on older decks
| Problem | What you’ll notice | Usual cause |
|---|---|---|
| Rot at the post base | Soft, dark or crumbling wood near the ground; a screwdriver sinks in | Post buried in soil or mulch, or set in a puddle |
| Frost heave | Deck or stairs higher in winter, gaps that open and close by season | Footing above the frost line |
| Settling or sinking | A low corner, a sagging beam, boards that slope away from the house | Footing too small or poured on loose fill |
| Post off its footing | Post bearing on the edge of the concrete, or beside it | Footing poured in the wrong spot or shifted |
| Beam bolted to the side of the post | Through-bolts carrying the full load, no notch or cap | An older method current guides prohibit |
| Undersized posts | Tall 4×4 posts on a raised deck | Built before 6×6 became the guide minimum |
| Rusted connectors | Flaking post bases, bolts or brackets | Wrong coating for treated lumber, or constant wetting |
A quick check you can do
Put a level on each post, both directions. Push firmly on the railing at each corner and watch the post below for movement. Probe the bottom of each post with a screwdriver, digging a little soil away if the post goes into the ground. Then look at how the beam sits on top: it should bear on a notch or sit in a metal post cap, not hang from bolts alone. Anything that fails one of those checks deserves a professional look.
Why deck posts rot at the bottom
Posts rot from the bottom because that is where they stay wet: in contact with soil, buried in mulch, sitting in a low spot where water pools, or set in concrete that holds water against the end grain. Treated lumber resists decay, but its protection depends on being rated for the exposure and on the cut end being treated.
DCA 6, the prescriptive deck manual published by the American Wood Council, requires all lumber in contact with the ground to be preservative-treated for ground contact, and it says the cut ends and notches of posts get a brushed-on preservative in the field, with copper naphthenate given as an example. Too often we find posts cut to length on site with the raw end buried, which is the exact spot rot begins.
The better detail keeps the wood out of the ground entirely. A post that sits on top of a concrete footing in a galvanized or stainless metal post base, which is what DCA 6 calls for in pre-manufactured anchors, stays dry at the bottom and is easy to inspect. Keeping mulch beds and soil pulled back from the posts helps as well, and our post on moisture and rot under decks covers drainage and airflow under the frame.
DCA 6, the prescriptive deck manual published by the American Wood Council, requires all lumber in contact with the ground to be preservative-treated for ground contact, and it says the cut ends and notches of posts get a brushed-on preservative in the field, with copper naphthenate given as an example. Too often we find posts cut to length on site with the raw end buried, which is the exact spot rot begins.
The better detail keeps the wood out of the ground entirely. A post that sits on top of a concrete footing in a galvanized or stainless metal post base, which is what DCA 6 calls for in pre-manufactured anchors, stays dry at the bottom and is easy to inspect. Keeping mulch beds and soil pulled back from the posts helps as well, and our post on moisture and rot under decks covers drainage and airflow under the frame.
Elevated composite deck with black aluminum balusters along a brick and siding home
Frost heave and footing depth in the tri-state
Footings move in winter when they sit above the depth where the ground freezes, because freezing soil expands and lifts whatever rests on it. The NCEI engineering weather summary for Cincinnati puts Cincinnati’s yearly tally of freeze-thaw cycles at 57, which means a footing that is too shallow can be pushed up and let down many times each winter. Over years that shows up as a deck that is no longer level, stairs that pull away, and connections that loosen.
On the Ohio side, we dig until we are under the frost line, which the permitting town or county fixes at 30–36 inches. Fairfield is a good example: its deck and porch permit page tells builders that piers and other permanent supports go down to a 30-inch frost line. In Kentucky and Indiana the county building office names the depth, and that is the number we dig to.
Depth is not the only rule. DCA 6 says footings must bear on undisturbed soil at least 12 inches below the ground surface or below the frost line, whichever is deeper, and that deck footings closer than 5 feet to a house foundation must bear at the same elevation as the house footing. That second rule matters next to a basement, where the soil was dug out and backfilled when the house was built.
On the Ohio side, we dig until we are under the frost line, which the permitting town or county fixes at 30–36 inches. Fairfield is a good example: its deck and porch permit page tells builders that piers and other permanent supports go down to a 30-inch frost line. In Kentucky and Indiana the county building office names the depth, and that is the number we dig to.
Depth is not the only rule. DCA 6 says footings must bear on undisturbed soil at least 12 inches below the ground surface or below the frost line, whichever is deeper, and that deck footings closer than 5 feet to a house foundation must bear at the same elevation as the house footing. That second rule matters next to a basement, where the soil was dug out and backfilled when the house was built.
Footings are inspected before the concrete goes in
On a permitted deck, the footing holes are inspected before concrete is poured, followed by framing and final inspections. Our team handles the permit with whichever local office has jurisdiction, for example in Butler County or Hamilton County, and schedule those inspections as part of the job. Footing repairs on an existing deck can need a permit too; we check with the local office before starting.
Talk it through with us
Send a few photos or book a visit and we’ll walk you through the options for your yard.
How a post should connect to the beam
The beam should bear directly on the post, sitting in a notch cut into the post’s top or in an approved metal cap, not hang off the side on bolts. DCA 6 is specific: posts must be 6×6 nominal or larger, centered on their footings, and attached to the beam by notching or a post cap, and a beam fastened to a post’s face with no notch is not allowed. All 3-ply beams need a post cap.
The guide also explains why it asks for 6×6 posts when the International Residential Code’s column minimum is a 4×4: a 4×4 would often be overstressed in the decks it covers, and a 6×6 gives the beam adequate bearing. Plenty of older decks around Cincinnati stand on 4×4 posts, and on a low deck they may be fine. On a raised deck, they are one of the first things we look at.
Bracing is the other piece. DCA 6 calls for diagonal bracing at each corner post taller than 2 feet, fastened with half-inch lag screws, though a freestanding deck with no ledger may skip it at the beam and posts next to the house. Missing or rotted bracing is a common reason an otherwise sound deck feels like it sways.
The guide also explains why it asks for 6×6 posts when the International Residential Code’s column minimum is a 4×4: a 4×4 would often be overstressed in the decks it covers, and a 6×6 gives the beam adequate bearing. Plenty of older decks around Cincinnati stand on 4×4 posts, and on a low deck they may be fine. On a raised deck, they are one of the first things we look at.
Bracing is the other piece. DCA 6 calls for diagonal bracing at each corner post taller than 2 feet, fastened with half-inch lag screws, though a freestanding deck with no ledger may skip it at the beam and posts next to the house. Missing or rotted bracing is a common reason an otherwise sound deck feels like it sways.
- Posts 6x6 nominal or larger, centered on the footing
- Beam resting in a notch or a metal cap on the post
- No beams carried only by bolts through the side of the post
- Diagonal bracing at corner posts more than 2 feet tall
- Galvanized or stainless post bases and connectors
How we repair posts and footings
A single rotted post or failed footing can usually be fixed without taking the deck apart. The deck is shored with temporary supports, the old post is cut out, the footing is checked and replaced if it is too shallow, too small or off center, and a new treated post goes onto a metal post base. The beam is then reconnected with a proper notch or post cap, and bracing is replaced where needed.
When several footings have heaved or settled, or the posts are undersized for the height, the repair becomes more involved: new footings at the correct depth, new posts, sometimes a new beam. On steep hillside lots, such as the steep streets of the West Side and the bluffs above the Ohio River, deeper soil conditions sometimes call for helical piers instead of poured footings; on new hillside builds those can add $2,500–7,000, though nobody should price them before the soil and slope have been looked at in person. Our deck repair service covers this work, and every structural repair is confirmed in person, never from photos alone.
If the posts and footings are failing along with the ledger, the joists and the boards, repair stops making sense. At that point a new deck on new footings is often the better use of the money, and we will show you both options side by side. Our deck replacement service includes free tear-out and hauling of the old deck as long as its replacement matches or exceeds its square footage, and our post on deciding between repair and replacement explains how we weigh it.
When several footings have heaved or settled, or the posts are undersized for the height, the repair becomes more involved: new footings at the correct depth, new posts, sometimes a new beam. On steep hillside lots, such as the steep streets of the West Side and the bluffs above the Ohio River, deeper soil conditions sometimes call for helical piers instead of poured footings; on new hillside builds those can add $2,500–7,000, though nobody should price them before the soil and slope have been looked at in person. Our deck repair service covers this work, and every structural repair is confirmed in person, never from photos alone.
If the posts and footings are failing along with the ledger, the joists and the boards, repair stops making sense. At that point a new deck on new footings is often the better use of the money, and we will show you both options side by side. Our deck replacement service includes free tear-out and hauling of the old deck as long as its replacement matches or exceeds its square footage, and our post on deciding between repair and replacement explains how we weigh it.
Elevated cedar deck and timber-frame pavilion on a wooded hillside lot with steel-beam substructure
Related reading
Rot Under Your Deck: Where Moisture Comes From and How to Stop It
From our guide: Deck Repair, Safety and Maintenance Through Ohio Seasons.
What Causes a Deck to Collapse, and How to Prevent It
From our guide: Deck Repair, Safety and Maintenance Through Ohio Seasons.
Repair or Replace Your Deck? An Honest Way to Decide
From our guide: Deck Repair, Safety and Maintenance Through Ohio Seasons.
Deck post and footing questions
Can you replace a rotted deck post without rebuilding the deck?
Usually, yes. We shore the deck, remove the rotted post, check or replace the footing, and set a new treated post on a metal post base before reconnecting the beam. If several posts and footings have failed, or the frame above is rotted too, a rebuild may make more sense.
What depth should a deck footing reach around Cincinnati?
Deeper than the frost line, which Southwest Ohio jurisdictions put somewhere in the 30–36 inch range; Fairfield, for one, uses 30 inches. Whoever issues the permit gives the exact figure and inspects the holes before any concrete is poured. For decks in Boone, Kenton, Campbell or Dearborn County, the county’s building office decides the depth.
Why is my deck higher in winter than in summer?
That is usually frost heave: a footing above the frost line gets lifted as the soil freezes and settles back as it thaws. NCEI’s count for the city is 57 freeze-thaw cycles a year, and a shallow footing can be nudged on many of them. The fix is a footing at the proper depth.
Are 4x4 deck posts acceptable?
The International Residential Code sets a 4×4 minimum, but DCA 6 from the American Wood Council asks for 6×6 posts because a 4×4 is often overstressed. On a low deck, existing 4×4 posts may be adequate; on a raised deck, we look at them closely and often recommend replacing them.
Should deck posts be buried in concrete?
We prefer posts that sit on top of the footing in a galvanized or stainless metal post base, so the end grain stays out of the ground and dry. Where wood does touch soil, it has to carry a ground-contact treatment rating, and every cut end needs a coat of preservative.