To plan a deck, start with a written list of what you will actually do on it, then let that list decide the zones, the size, the height and the stairs before anyone talks about boards or railings. Material, color and add-ons come last, because they serve the layout rather than shape it. That order is the backbone of our deck design and planning guide for tri-state homes, and this post walks through it step by step.
We call it the deck-first method. At Building Character, a family-run outfit in Cleves building decks around the region since 1994, Jennifer Riddell leads most of the planning and color conversations, and Jared and the crews turn the result into framing. The steps below are the same ones we follow at a first visit, so you can do most of the thinking before we ever pull out a tape.
We call it the deck-first method. At Building Character, a family-run outfit in Cleves building decks around the region since 1994, Jennifer Riddell leads most of the planning and color conversations, and Jared and the crews turn the result into framing. The steps below are the same ones we follow at a first visit, so you can do most of the thinking before we ever pull out a tape.
Quick answer
10 min read
Planning orderUses → site → zones → height and code → boards and color → extras
Who leads designJennifer Riddell, co-owner
Design cost3D design included with the proposal
Guards requiredWalking surfaces more than 30 in above grade
Minimum stair width36 in
Cincinnati rainAbout 45 in a year
Build timeUsually 1–3 weeks after permits
Step one: write down what the deck has to do
The first planning step is a plain list of activities, ranked by how often they will happen, because the most frequent use earns the best spot on the deck. Think about a normal Tuesday in June as much as the big Fourth of July cookout. A family that grills four nights a week needs the grill a few steps from the kitchen door; a couple who reads outside every morning cares more about shade and a quiet corner than about seating for twelve.
Be honest about the furniture you own and the furniture you plan to buy. A sectional you already love is a fixed size, and the deck should be drawn around it rather than squeezed after the fact. The same goes for a hot tub you hope to add in three years: it changes the framing today, so it belongs on the list now.
Be honest about the furniture you own and the furniture you plan to buy. A sectional you already love is a fixed size, and the deck should be drawn around it rather than squeezed after the fact. The same goes for a hot tub you hope to add in three years: it changes the framing today, so it belongs on the list now.
- Everyday meals: how many people, and how often
- Cooking: gas grill, smoker, or a future outdoor kitchen
- Lounging: sectional, chairs, a fire table
- Kids and pets: open floor, a gate at the stairs
- Hosting: the largest group you realistically expect
- Later additions: a hot tub, a pergola, a screened room below
- Quiet use: a spot for coffee or reading, out of the traffic
Rank the list before you size anything
Put a 1 next to anything you will do most days, a 2 next to weekly uses and a 3 next to the few-times-a-year events. Daily uses get the prime position near the door with the best light. Weekly uses get their own zone. Events like graduation parties can borrow space from the lawn or a patio; sizing the whole deck for them usually leaves a big empty platform the other 360 days.
Step two: read the site before you draw
Your yard sets limits the list cannot override, so the second step is to study sun, slope, doors, views and water. Stand at the back door at the times you would use the deck and notice where the sun sits, where the neighbor’s windows look in and where the ground starts to fall away.
Water deserves more attention here than people expect. An ordinary Cincinnati year brings around 45 inches of precipitation, based on Current Results’ table of NOAA normals for Ohio cities, and plenty of it comes in heavy spring storms. Watch where runoff goes after a downpour. A deck built over a low spot or across a downspout path stays damp underneath, and that affects footing placement, board choice and whether a dry space below is even realistic.
Water deserves more attention here than people expect. An ordinary Cincinnati year brings around 45 inches of precipitation, based on Current Results’ table of NOAA normals for Ohio cities, and plenty of it comes in heavy spring storms. Watch where runoff goes after a downpour. A deck built over a low spot or across a downspout path stays damp underneath, and that affects footing placement, board choice and whether a dry space below is even realistic.
What to look for on a site walk, and what each observation changes
| Look at | Why it matters | What it changes in the plan |
|---|---|---|
| Afternoon sun | Decks facing west and south get hot by late day | Shade structure, lighter boards, where the lounge zone goes |
| Door locations | Every door creates a walking path | Where zones stop, so paths stay clear |
| Slope | Grade falling away raises the deck | Height, stairs, guards, possibly a second level |
| Views and neighbors | You will look one way more than another | Seating orientation, privacy screens |
| Runoff and wet spots | Water under a deck lingers | Footing layout, drainage, under-deck plans |
| Trees | Leaves, shade and roots | Board choice, gaps for cleaning, footing positions |
Low composite deck with cable railing and an outdoor kitchen island in a wooded backyard
Step three: turn uses into zones, paths and a shape
Once you know the uses and the site, each important use becomes a zone, and the deck’s outline is drawn around the zones plus the paths between them. This is where the deck gets its shape; a rectangle is often right, but an L that wraps a corner or a smaller upper deck with a larger lower one can fit the list better.
Draw the doors first, then the paths from each door to the stairs and to each zone. Paths should not cut through the middle of a dining table or a conversation circle. Then place the cooking zone close to the kitchen door and away from the spot where smoke would drift into seating. The quiet zone goes farthest from traffic.
Stairs need their own room in the plan, and on the yard side too. The American Wood Council’s DCA 6 prescriptive deck construction guide, which follows the International Residential Code, calls for stairs at least 36 inches wide and a light source at the top landing that lights every step. Where the stairs land matters as much as where they start, because the bottom step should meet a path or patio, not a muddy patch of lawn.
Draw the doors first, then the paths from each door to the stairs and to each zone. Paths should not cut through the middle of a dining table or a conversation circle. Then place the cooking zone close to the kitchen door and away from the spot where smoke would drift into seating. The quiet zone goes farthest from traffic.
Stairs need their own room in the plan, and on the yard side too. The American Wood Council’s DCA 6 prescriptive deck construction guide, which follows the International Residential Code, calls for stairs at least 36 inches wide and a light source at the top landing that lights every step. Where the stairs land matters as much as where they start, because the bottom step should meet a path or patio, not a muddy patch of lawn.
Tape it out on the ground
Before we draw anything final, we often ask homeowners to mark the outline with garden hose or spray paint and set their real furniture inside it. Walk the paths with a plate in each hand. Pull chairs back from the table as if someone were getting up. Ten minutes of this tells you more than any drawing, and it is free to change.
Talk it through with us
Send a few photos or book a visit and we’ll walk you through the options for your yard.
Step four: settle height, code and permits early
Height and code come before material because they decide the structure, the railing and the paperwork, and they are expensive to change once footings are poured. The height of the deck usually follows the door threshold, so the yard’s slope sets how far above grade the far edge ends up.
Two thresholds shape most designs. DCA 6 requires a guard on any deck more than 30 inches above grade, so a deck that stays below that line can have open edges, built-in steps or benches instead of a railing run. And in Ohio, a small freestanding deck can skip the building permit: Clermont County Permit Central’s deck guide handout exempts decks of 200 square feet or less that sit no more than 30 inches above grade, are not attached to the house and do not serve the required exit door. Attach the deck to the house or go past either number and a permit applies, and zoning setbacks apply either way.
Permit offices differ across the tri-state. In unincorporated Hamilton County the work goes through Hamilton County Buildings & Inspections; in the city it is Cincinnati’s own department; across the river and in Indiana the county or city sets its own process. Our team files the application and books each inspection (footing, then framing, then final), so this step is mostly about knowing which design choices push you over a threshold.
Two thresholds shape most designs. DCA 6 requires a guard on any deck more than 30 inches above grade, so a deck that stays below that line can have open edges, built-in steps or benches instead of a railing run. And in Ohio, a small freestanding deck can skip the building permit: Clermont County Permit Central’s deck guide handout exempts decks of 200 square feet or less that sit no more than 30 inches above grade, are not attached to the house and do not serve the required exit door. Attach the deck to the house or go past either number and a permit applies, and zoning setbacks apply either way.
Permit offices differ across the tri-state. In unincorporated Hamilton County the work goes through Hamilton County Buildings & Inspections; in the city it is Cincinnati’s own department; across the river and in Indiana the county or city sets its own process. Our team files the application and books each inspection (footing, then framing, then final), so this step is mostly about knowing which design choices push you over a threshold.
Step five: choose boards, rail and color for the plan you drew
Material and color are chosen last because the layout tells you what they need to handle: sun, shade, water, foot traffic and how the deck will look from inside the house. A shaded deck under maples near a creek and a wide-open deck facing west ask different things of a board.
Jennifer usually brings sample boards to the house and lays them on the ground in the actual light, next to the siding, brick and trim. Colors shift a lot between a showroom and a north-facing yard. She also looks at the railing from the kitchen window, since that is the view you will have most of the year, and black aluminum, cable or a composite rail each change that view differently.
Jennifer usually brings sample boards to the house and lays them on the ground in the actual light, next to the siding, brick and trim. Colors shift a lot between a showroom and a north-facing yard. She also looks at the railing from the kitchen window, since that is the view you will have most of the year, and black aluminum, cable or a composite rail each change that view differently.
Board direction is a structural choice too
Running boards on a diagonal or in a herringbone can make a plain rectangle more interesting, but it changes the framing underneath. TimberTech notes on its Pro Terrain product page that diagonal layouts and stairs typically need tighter joist spacing than straight runs. Decide the pattern before the framing plan is drawn; our page on deck inlays and borders shows what those patterns look like built.
Certified installation on three brands
Three of the brands we install, AZEK, TimberTech and Deckorators, list us as a certified installer; Trex and Fiberon boards go on plenty of our decks too, just without that credential. The brand matters less at the planning stage than the board’s character: capped composite, PVC or mineral-based, and the color family that suits the house.
Wide brown composite deck surface framed by black aluminum railing with an open lawn beyond
Step six: plan for the extras, even if you add them later
Anything you might add in the next few years should be built into the plan now, because a deck is far easier to prepare for an addition than to retrofit. That does not mean buying everything at once. It means placing a few inexpensive provisions while the frame is open.
Common examples: a conduit run for future lighting so wires never cross the floor, blocking where a pergola post or a privacy screen will land, a gas line stub for a future kitchen, and framing sized for a hot tub on one corner. Hot-tub loads in particular are confirmed on site with the exact model’s specifications; nothing about a hot tub is promised from photos alone.
When you are ready to see all of this together, our custom deck building service opens with a free sit-down, either at your kitchen table or over a video call, and the proposal comes with a 3D design you can turn and walk through. The deck design tools page explains what the 3D model shows. Drawings, the permit and the build all sit inside one proposal for one price, and the job closes with the inspection and a final walkthrough together. Build time on site is usually a one-to-three-week window once the city or county signs off, and the plan you settled in steps one through five is what decides where in that window yours falls.
Common examples: a conduit run for future lighting so wires never cross the floor, blocking where a pergola post or a privacy screen will land, a gas line stub for a future kitchen, and framing sized for a hot tub on one corner. Hot-tub loads in particular are confirmed on site with the exact model’s specifications; nothing about a hot tub is promised from photos alone.
When you are ready to see all of this together, our custom deck building service opens with a free sit-down, either at your kitchen table or over a video call, and the proposal comes with a 3D design you can turn and walk through. The deck design tools page explains what the 3D model shows. Drawings, the permit and the build all sit inside one proposal for one price, and the job closes with the inspection and a final walkthrough together. Build time on site is usually a one-to-three-week window once the city or county signs off, and the plan you settled in steps one through five is what decides where in that window yours falls.
Related reading
How Big Should a Deck Be? Size It Zone by Zone
From our guide: Deck Design Ideas and Planning for Tri-State Homes.
Free 3D Deck Design: What to Expect, Step by Step
From our guide: Deck Design Ideas and Planning for Tri-State Homes.
Multi-Level Deck Ideas for Sloped Yards
From our guide: Deck Design Ideas and Planning for Tri-State Homes.
Deck planning questions
What is the first step in planning a deck?
Write down how you will use it and rank those uses by how often they happen. Everything else (zones, size, height, stairs, boards) follows from that list. Starting with a board color or a picture from a magazine tends to produce a deck that looks good and works poorly.
How long does it take to plan and build a deck in Cincinnati?
Planning usually moves quickly: a consultation, then a proposal with a 3D design. Permit timing depends on the office, which varies across Hamilton County, the City of Cincinnati and the counties across the river. Crew time after approval is commonly a one-to-three-week window, and intricate designs or a wet month push it longer.
Will a deck in Cincinnati or Northern Kentucky need a permit?
Usually yes. Ohio wants a permit for a ledger-hung deck even an inch off the grass, and freestanding decks are generally exempt only when they are 200 sq ft or smaller, no more than 30 inches above grade and not serving the required exit door. Kentucky and Indiana follow similar logic with their own offices. Handling that paperwork is part of our proposal.
Should I pick the decking material before the layout?
We suggest the opposite. The layout tells you how much sun, shade and water the boards will face and how the deck will look from inside, and those answers narrow the material and color quickly. Jennifer brings samples so the comparison happens in your yard’s real light.
Can I plan for a hot tub or pergola now and add it later?
Yes, and it is the cheaper route. Blocking, conduit, a gas stub or heavier framing in one corner cost far less while the frame is open than after the boards are down. Hot-tub framing is confirmed on site against the model’s own specifications.