Installed in the Cincinnati tri-state, TimberTech’s entry Edge composite costs about $40–55 per square foot, its Pro composite about $45–65, and TimberTech Advanced PVC, the line that carries the AZEK name, about $55–80. On a raised deck that gap gets multiplied by the height factor, so moving from Edge to Advanced PVC can add $8,000 or more to a mid-sized walkout. Our deck cost guide for Cincinnati compares every material; this post stays with the TimberTech family.
Building Character is a certified TimberTech and AZEK installer and has been building decks around Greater Cincinnati since 1994. We put both kinds of TimberTech board on decks every season, so the figures below are the ones we use when a homeowner asks whether PVC is worth it for their yard.
Building Character is a certified TimberTech and AZEK installer and has been building decks around Greater Cincinnati since 1994. We put both kinds of TimberTech board on decks every season, so the figures below are the ones we use when a homeowner asks whether PVC is worth it for their yard.
Quick answer
9 min read
TimberTech Edge composite, installed$40–55 per sq ft
TimberTech Pro composite, installed$45–65 per sq ft
Advanced PVC (AZEK), installed$55–80 per sq ft
Composite product warranty25 to 30 years, by collection
Advanced PVC product warrantylimited lifetime
14 × 20 ft walkout: Edge vs Advanced PVC≈ $25,100 vs ≈ $33,300
TimberTech and AZEK prices by tier
TimberTech’s composite boards cost about $40–65 per square foot installed around Cincinnati, and its Advanced PVC boards about $55–80, with most of the difference coming from what the board is made of. These figures price the deck platform: footings, frame, boards, fasteners and labor at ground level.
TimberTech now presents its decking as two families on its decking overview: Composite, which it pitches as long-lasting performance at a more accessible price, and Advanced PVC, pitched for the toughest conditions. Within composite, many dealers and price guides still use the older Edge and Pro labels, Edge for the entry collections and Pro for the step up, and we price them that way because the installed cost really does differ.
TimberTech now presents its decking as two families on its decking overview: Composite, which it pitches as long-lasting performance at a more accessible price, and Advanced PVC, pitched for the toughest conditions. Within composite, many dealers and price guides still use the older Edge and Pro labels, Edge for the entry collections and Pro for the step up, and we price them that way because the installed cost really does differ.
Installed TimberTech and AZEK decking cost, Cincinnati tri-state 2026 (ground-level platform)
| Tier | Example collection | Installed, per sq ft | Typical figure we use | 280 sq ft platform (typical) |
|---|---|---|---|---|
| Edge composite (entry) | Prime | $40–55 | $47 | ≈ $13,200 |
| Pro composite (mid) | Legacy | $45–65 | $55 | ≈ $15,400 |
| Advanced PVC / AZEK (premium) | Vintage, Landmark, Harvest | $55–80 | $68 | ≈ $19,000 |
Where AZEK fits in the TimberTech name
Homeowners often ask us for AZEK and TimberTech as if they were rival brands. They are one family: the AZEK PVC collections are sold as TimberTech Advanced PVC, and TimberTech’s own collections page lists Vintage, Landmark, Harvest+ and Harvest under that heading. If a quote says AZEK and another says Advanced PVC, check the collection name before comparing prices.
What moves a TimberTech quote within its tier
Inside each band, the figure climbs with the details. Wider or varied-width boards, a contrasting picture-frame border (which raises the decking line by roughly 5–10%) and a diagonal or herringbone pattern (roughly 15–20%) all add cutting, blocking and waste. Color matters less than people expect, though a less common shade can mean a longer wait for stock. Access counts too: a deck behind a house on a steep lot, where every board is carried by hand, takes longer to build than one beside a driveway. Each of these gets its own note in the proposal, showing you which choice is driving the number and drop it if you would rather spend elsewhere.
What the extra money buys: caps, cores and warranties
Each step up the TimberTech range buys more cap coverage and a longer warranty, and the jump to Advanced PVC removes wood from the board entirely. That is the difference you are paying for, and it matters more on some decks than others.
The entry Prime collection is a scalloped composite board capped on three sides, made from a mix of polymers and reclaimed wood fibers, and TimberTech backs it for 25 years under both its product and its fade and stain limited warranties. The Legacy collection uses the same kind of core but caps all four sides, and its product and fade and stain warranties run up to 30 years. Advanced PVC is engineered with zero wood or organic fillers inside a four-sided cap, and TimberTech’s warranty page lists a limited lifetime product warranty for it, with fade and stain coverage of 35 or 50 years depending on the collection.
The entry Prime collection is a scalloped composite board capped on three sides, made from a mix of polymers and reclaimed wood fibers, and TimberTech backs it for 25 years under both its product and its fade and stain limited warranties. The Legacy collection uses the same kind of core but caps all four sides, and its product and fade and stain warranties run up to 30 years. Advanced PVC is engineered with zero wood or organic fillers inside a four-sided cap, and TimberTech’s warranty page lists a limited lifetime product warranty for it, with fade and stain coverage of 35 or 50 years depending on the collection.
TimberTech board construction and limited warranties, per timbertech.com
| Board | Core | Cap | Product warranty | Fade and stain warranty |
|---|---|---|---|---|
| Prime (Edge) | Polymers and reclaimed wood fibers | Three sides | 25 years | 25 years |
| Legacy (Pro) | Polymers and reclaimed wood fibers | Four sides | Up to 30 years | Up to 30 years |
| Advanced PVC (AZEK) | No wood or organic fillers | Four sides | Limited lifetime | 35 or 50 years, by collection |
Why the core matters in a humid river valley
Moisture is the reason the core matters here. Greater Cincinnati’s monthly relative humidity averages sit around 75–78% over the year in the NOAA 1991–2020 normals summarized by Climate-Zone.com, and a deck shaded by trees or sitting over a patio may hold moisture long after the rain stops. A board with wood fiber in its core relies on the cap to keep water out, so an uncapped underside is one more surface exposed. An Advanced PVC board has no wood or organic filler in it at all, under the cap or beneath it.
Close-up of gray-brown PVC deck boards with a picture-frame border board
A 14 × 20 ft walkout deck priced in all three tiers
Built as a 14 × 20 ft walkout with aluminum rail and eight steps, the deck in Edge composite comes to about $25,100, Pro to about $28,300 and Advanced PVC to about $33,300. The PVC premium over Edge is roughly $8,200, about 40% more than the same upgrade would cost at ground level.
Here is the setup. The deck is 280 sq ft, off the back of a two-story house in Mason in Warren County, one story up over a future patio. For the height, each platform figure gets the 1.40 walkout multiplier from our calculator. On top go 42 feet of black aluminum rail at a typical $95 per foot, which is $3,990, plus $2,400 for eight composite steps priced near $300 apiece and $300 set aside for the permit. Those three lines total $6,690 and do not change with the board.
Here is the setup. The deck is 280 sq ft, off the back of a two-story house in Mason in Warren County, one story up over a future patio. For the height, each platform figure gets the 1.40 walkout multiplier from our calculator. On top go 42 feet of black aluminum rail at a typical $95 per foot, which is $3,990, plus $2,400 for eight composite steps priced near $300 apiece and $300 set aside for the permit. Those three lines total $6,690 and do not change with the board.
280 sq ft walkout deck, aluminum rail, eight steps (typical figures)
| Tier | Platform | × 1.40 walkout | Rail, steps, permit | Total (≈) |
|---|---|---|---|---|
| Edge composite | $13,160 | $18,424 | $6,690 | $25,100 |
| Pro composite | $15,400 | $21,560 | $6,690 | $28,300 |
| Advanced PVC (AZEK) | $19,040 | $26,656 | $6,690 | $33,300 |
Why height magnifies the PVC premium
At ground level, the Edge-to-PVC difference on 280 sq ft is $5,880 at typical rates. A walkout factor applies to the whole deck structure, boards included, so that difference becomes about $8,200 once the deck is raised. A second-story deck, at a typical factor of 1.55, would stretch it further. That is worth knowing before you fall for a PVC color on a tall deck.
If you plan to use the space underneath
Decks like this one often get a patio below. An under-deck drainage trough without a finished ceiling runs about $4–6 per square foot, roughly $1,100–1,700 for 280 sq ft, and it pairs well with PVC boards above. Our under-deck drainage cost post goes through when it pays off.
See a range for your own deck
The calculator turns size, height, boards and railing into a planning range in a couple of minutes. A free consultation, on site or by video, turns it into a written proposal.
When Advanced PVC is worth paying for
Advanced PVC earns its higher price on shaded, damp, poolside and hard-to-reach decks; on an open, sunny deck with ordinary traffic, Edge or Pro composite usually delivers nearly the same everyday result for less money. We say that even though PVC is the bigger sale.
Situations where we lean toward AZEK or another Advanced PVC collection:
Situations where we lean toward AZEK or another Advanced PVC collection:
- Decks under mature trees that stay wet and collect leaves
- Pool surrounds that get splashed all summer
- Second-story decks over a patio or screened room, where replacing boards later is harder
- North-facing decks that rarely dry out between rains
- Owners planning to stay long enough to value a lifetime product warranty
When composite is the smarter spend
A ground-level deck in full sun, a rental, or a budget where the savings could go into better railing, lighting or a wider stair are all cases where we usually suggest Pro or Edge. A four-sided Legacy board closes much of the moisture gap at a mid-tier price, and the $13–21 per square foot you save over PVC at typical rates can do more good elsewhere on the project.
Certified installation and the warranties that follow it
As a certified TimberTech and AZEK installer, we follow TimberTech’s rules for joist spacing, gapping and approved fasteners, and that matters because the board warranties depend on correct installation. PVC in particular expands and contracts with temperature, so gaps at board ends and butt joints are set to TimberTech’s instructions, not by eye.
TimberTech also lists a limited replacement labor warranty on its warranty page that applies when registered TimberTech contractors install its products following its instruction guides. We explain at the consultation how that applies to your boards. On our side, qualifying composite or PVC decks paired with aluminum railing, whether new builds or major renovations, are covered by our own extended workmanship and labor warranty, which usually runs 5–10 years depending on the material and the job. Our crew handles that warranty work in-house at no labor charge, and you get the exact terms in writing before you sign.
To see collections and colors in your own light, book a free consultation or send photos through our virtual quote form. Our pages on TimberTech decking and AZEK decking go deeper on how we build with each, and the cost calculator will price any of the three tiers for your size and height.
TimberTech also lists a limited replacement labor warranty on its warranty page that applies when registered TimberTech contractors install its products following its instruction guides. We explain at the consultation how that applies to your boards. On our side, qualifying composite or PVC decks paired with aluminum railing, whether new builds or major renovations, are covered by our own extended workmanship and labor warranty, which usually runs 5–10 years depending on the material and the job. Our crew handles that warranty work in-house at no labor charge, and you get the exact terms in writing before you sign.
To see collections and colors in your own light, book a free consultation or send photos through our virtual quote form. Our pages on TimberTech decking and AZEK decking go deeper on how we build with each, and the cost calculator will price any of the three tiers for your size and height.
Elevated composite deck with a screened room underneath and a stamped-concrete patio
Related reading
Trex Decking Cost in Cincinnati: Enhance to Signature (2026)
From our guide: How Much Does a Deck Cost in Cincinnati.
Under-Deck Drainage Cost, and When It Is Worth Paying For
From our guide: How Much Does a Deck Cost in Cincinnati.
Second-Story and Walkout Deck Cost in Cincinnati (2026)
From our guide: How Much Does a Deck Cost in Cincinnati.
TimberTech and AZEK cost questions
How much does a TimberTech deck cost in Cincinnati?
TimberTech composite, installed around Cincinnati, comes to about $40–55 per square foot for the Edge collections and $45–65 for Pro, before railing, stairs and height. Our 280 sq ft walkout example, built in Edge with black aluminum railing and eight steps, totals roughly $25,100.
How much does AZEK decking cost per square foot?
Expect roughly $55–80 a square foot installed across the tri-state, with $68 as the typical figure we plan around. AZEK boards are now sold as TimberTech Advanced PVC, so you may see either name on a quote.
Are AZEK and TimberTech one brand?
Yes, in practice: they belong to one company family. TimberTech sells composite boards under its own name and the AZEK PVC collections, such as Vintage, Landmark and Harvest, as TimberTech Advanced PVC. Building Character is certified with both.
Is PVC decking worth it over composite for a deck in Mason or West Chester?
On an open, sunny lot, usually not; a four-sided composite such as Legacy handles that well for less. Where the deck is shaded, near a pool or one story up over a patio, PVC’s lack of wood content and its lifetime product warranty can justify the extra cost.
Do TimberTech warranties cover labor?
TimberTech lists a limited replacement labor warranty that applies when registered TimberTech contractors install its products per its instruction guides. Separately, our own workmanship warranty covers qualifying composite and aluminum-rail projects across the tri-state, with exact terms in writing.
Sources
TimberTech: decking overview, Composite vs Advanced PVC
TimberTech: deck collections by family
TimberTech: warranty overview (Advanced PVC, Composite, labor)
TimberTech: Prime collection, three-sided cap, 25-year warranties
TimberTech: Legacy collection, four-sided cap, up to 30-year warranties
Climate-Zone.com: Greater Cincinnati climate, NOAA 1991–2020 normals (relative humidity)
TimberTech: deck collections by family
TimberTech: warranty overview (Advanced PVC, Composite, labor)
TimberTech: Prime collection, three-sided cap, 25-year warranties
TimberTech: Legacy collection, four-sided cap, up to 30-year warranties
Climate-Zone.com: Greater Cincinnati climate, NOAA 1991–2020 normals (relative humidity)
Ranges are planning estimates for the Cincinnati tri-state based on published 2025–2026 cost data and typical projects. Your proposal follows an on-site or virtual measurement.