We begin with the load path. A roof adds dead weight and snow load to the deck’s posts, and on a hillside those posts may be tall and their footings set in sloping ground. For a new deck, we size footings, posts and beams for the roof from day one, and every footing goes 30 inches deep or more, counted from the low side of the hole. For an existing deck, we check what is already there. Sometimes the frame can carry a light pergola as is; a solid roof or screened room more often needs new posts and footings, sometimes helical piers on steep spots, which we confirm on site.
Next comes the tie-in. Where the house wall allows it, the roof can attach to the house with a ledger and flashing. On a two-story wall above a walkout, we look at where the new roof meets the siding, windows and existing gutters so that water goes where it should. Freestanding posts at the house side are an option when attaching isn’t practical.
Then the finish. Rafters can be left open for a pergola, or covered with a ceiling of tongue-and-groove, composite or vinyl soffit. Fan boxes and light circuits are run while the framing is still open. Screened rooms get a framed knee wall or railing at the base and screen panels above. Beneath a high deck,
under-deck drainage turns the walkout patio into dry cover too. Design, the county permit and construction are part of the price.