Most of what makes a wall last ends up buried. The crew digs a base trench, spreads and tamps crushed stone into a flat bed for the bottom course, and sets that bottom course partly into the ground so the wall has something to push against. In the zone right behind the wall goes washed, open-graded stone, and along its bottom a perforated pipe carries water out to daylight or a drain. A layer of landscape fabric separates that stone from the native Cleves soil so silt can’t creep in and choke the drainage.
A taller wall may need geogrid reinforcement laid into the backfill in layers, and some walls need a design stamped by an engineer. We don’t guess at either. Before we break ground, the local building department tells us if your particular wall requires a permit, an engineered plan, or both. When a wall stands near a deck, its position is coordinated with the deck footings so neither puts loads on the other that it wasn’t designed to take.
A wall is rarely the whole point. It can create the level ground for a
stone or paver patio, give a
hillside deck level footing room beneath it, or carry a stair from one level to the next. Widen the cap and it becomes a bench; leave gaps in the face and they become planters; tuck low-voltage fixtures under the cap and the wall lights the path at night. With our crews based on Furlong Drive, stone and machines are staged a short haul away, which helps when a Cleves wall, patio and deck go in one after another.