Retaining Wall Contractors in Cleves, OH

In a village squeezed between two rivers, the real enemy of a retaining wall is the water soaking the ground behind it. Our Cleves crews give every block, boulder and stone wall a way to shed that water, so it keeps holding a patio terrace, a planting bed or the slope next to your deck year after year.
Boulder retaining wall holding a planting bed along a house foundation

Walls drawn with your deck

Building since 1994

Retaining walls for Cleves yards

When someone in Cleves phones about a wall, the story is usually familiar. A bed loses its mulch to the lawn every time it storms, timbers from an old tie wall are bowing outward, the ground under the deck falls away too steeply to use, or there’s simply nowhere flat to put a patio. Village permits and local conditions are covered on our deck builders in Cleves page, and every wall type we offer is compared on the retaining walls service page.

Our view of walls is a deck builder’s view. Engineering decks for sloped lots is something Building Character does often, and around Cleves the wall is frequently one piece of a bigger job: flattening the ground beneath a deck, holding grade alongside a new stair, or shaping a terrace for pavers and a fire pit. Drawing the wall, its drain and the deck footings on one plan keeps any of them from undercutting another.

Quick answer

Retaining walls in Cleves, in brief

We don’t post a price range for retaining walls; height, material, drainage and how equipment reaches the yard differ too much between lots. On Cleves properties, managing water shapes every design, so each wall we build gets washed stone, a perforated pipe and a defined outlet behind it. Pricing comes from a site visit.
Wall typesBlock, boulder, fieldstone, veneer
Hidden layersWashed stone, pipe, fabric, outlet
River-side lotsFloodplain map reviewed first
PricingQuoted after we see the slope

Why water decides how a Cleves wall is built

Any retaining wall is resisting two forces at once: the weight of the earth and the water that earth is holding. Cleves soil is soaked often, and soaked soil presses on a wall much more than it does in a dry spell. Yearly precipitation around Cincinnati totals about 43–45 inches, and in the lowest parts of the village, by either river, the soil can stay waterlogged for days after a storm clears. Give that water no exit and the wall ends up carrying a load it was never sized for.

Winter makes it worse. Our region sees something like 57 freeze-thaw cycles between late fall and early spring. Each time trapped water behind a wall turns to ice, it swells and nudges the face outward a little. A few winters of that is how bulges, tilts and cracked courses begin. Washed stone and a perforated pipe tucked behind the wall let the water drain away before the next hard freeze can lock it in.

Location matters too. Where a Cleves yard sits low toward the rivers, the floodplain map gets checked before any wall is drawn, since it may affect the wall’s placement, how it copes with high water and what review the job requires. On a low lot, a wall that dams the natural flow of runoff can push water where nobody wants it, toward your foundation or into the yard next door. So we shape the grade around the wall to steer water somewhere harmless.
Tiered block retaining walls creating level terraces in a sloped backyard
Curved stone retaining wall around a raised planting bed in a front yard

Building a retaining wall in Cleves, step by step

Most of what makes a wall last ends up buried. The crew digs a base trench, spreads and tamps crushed stone into a flat bed for the bottom course, and sets that bottom course partly into the ground so the wall has something to push against. In the zone right behind the wall goes washed, open-graded stone, and along its bottom a perforated pipe carries water out to daylight or a drain. A layer of landscape fabric separates that stone from the native Cleves soil so silt can’t creep in and choke the drainage.

A taller wall may need geogrid reinforcement laid into the backfill in layers, and some walls need a design stamped by an engineer. We don’t guess at either. Before we break ground, the local building department tells us if your particular wall requires a permit, an engineered plan, or both. When a wall stands near a deck, its position is coordinated with the deck footings so neither puts loads on the other that it wasn’t designed to take.

A wall is rarely the whole point. It can create the level ground for a stone or paver patio, give a hillside deck level footing room beneath it, or carry a stair from one level to the next. Widen the cap and it becomes a bench; leave gaps in the face and they become planters; tuck low-voltage fixtures under the cap and the wall lights the path at night. With our crews based on Furlong Drive, stone and machines are staged a short haul away, which helps when a Cleves wall, patio and deck go in one after another.

Wall types we build in Cleves

Nearly every Cleves wall on our books uses one of these four approaches. Height, the style of your house and whether a machine can reach the spot usually settle the choice.

Segmental block

Dry-stacked concrete units that key into the course below, in split-face or tumbled textures. Curves, corners and built-in steps are all straightforward. On taller runs, geogrid layers go into the backfill.

Boulder walls

Big stones nested into the slope so the result looks like it grew there, with room for plants and natural steps between them. A machine has to reach the spot, so access matters.

Natural stone and veneer

Fieldstone or limestone laid piece by piece, or a thin stone face over a concrete core, matched to a Cleves house’s brick or siding. The traditional choice, and a slower build than block.

Terraced walls

Two or three lower walls instead of one tall one, each step holding a strip of lawn, a bed, or a level for a fire pit. Spreading the height across several walls is often gentler on the soil.

Three decisions for a Cleves retaining wall

These three set a Cleves wall’s price, its look and its lifespan, and we settle them out at the slope with you.

01

One tall wall or a series of steps

A single tall wall saves yard space but demands more structure behind it and may need an engineer’s design. Two lower walls share the load and give you two usable levels, which often suits a Cleves backyard better.

02

Material and look

Block goes up efficiently and looks uniform; boulders look like part of the land; stone or veneer suits a traditional house. A wall that matches the house and the deck makes the yard read as a single plan.

03

Where the water goes

Each wall’s drain pipe needs somewhere to empty. On a low, wet village lot, choosing that spot and shaping the ground around the wall to send water there is about the most important call in the whole design.

How your Cleves retaining wall gets built

01

Slope walk

Jared or Jennifer studies the grade and soil with you, asks where water runs in a downpour, and checks how a machine can get back there.

02

Layout and proposal

You receive a plan showing wall height, material and drainage, along with a proposal that breaks the job into lines.

03

Floodplain and permit check

Low Cleves yards get a floodplain map review, and the local building department tells us whether a permit or engineered plan is required.

04

Dig, base and drain

The trench, tamped base, partly buried first course, pipe, fabric and washed stone are placed as one sequence.

05

Courses, cap and grading

The wall rises, the cap is set, the ground is shaped to move water away, and we tour the finished wall together.

Pricing a retaining wall in Cleves

You won’t find dollar figures for retaining walls on our site, since the price leans so hard on site conditions. Height outweighs length: each added course calls for a deeper dig, a thicker base, more drain stone and perhaps geogrid or an engineered plan. Material is next, and segmental block usually goes up faster than hand-set stone or machine-placed boulders. In Cleves, water can move the number more than it would on higher, drier ground, because a soggy lot may call for extra drain stone, a longer pipe to a workable outlet, or regrading around the wall. Access matters as well: when a Cleves backyard is reachable only through a slim side yard, deliveries and machines take longer. Pulling out an old timber wall and trucking off surplus soil also add to the job. After the slope walk, each item, from wall and drain to steps and soil hauling, gets its own proposal line.
Every proposal is itemized after we measure, so you see where the money goes.

Cleves wall cost factors

HeightDig depth, base, drain stone, geogrid
Biggest single factor
WaterPipe run, outlet, regrading on wet ground
Often larger in Cleves
MaterialBlock, boulder, fieldstone, veneer
Second biggest
Access and haul-offMachine path, old timbers, extra soil
Set by the yard
There’s no published range for retaining walls. Your Cleves proposal is written after we’ve walked the slope.

Permits and review for Cleves retaining walls

Whether a Cleves wall gets a permit hinges on how tall it is, what weight sits behind it and what local rules say, and the local building department settles that for your parcel before the first shovelful. Because the reviewing office for Cleves work can vary by parcel, identifying it is the first task. Walls that are tall, that hold up a drive or a building, or that are tied into a deck project draw review most often, and some of those call for an engineer. For a wall in a low corner of Cleves, our team pulls up the floodplain map at the design stage, since it can change where the wall belongs and what review applies. Property-line setbacks may still govern a wall that needs no building permit. A deck that comes with the wall and fastens to the house is permitted separately, on footings sunk past 30 inches. For wall and deck reviews in towns around Cleves, see the Hamilton County hub.

Wall review checklist for Cleves

Permit?Checked per wall and per parcel
Most often reviewedTall walls, walls bearing loads
Near the riversFloodplain map read during design
SetbacksMay apply with no building permit
Paired with a deckSeparate deck permit, 30 in. footings

Looking after a retaining wall in Cleves

Upkeep on a drained wall is light, and it’s mostly about watching water. After a big storm, make sure the pipe outlet is still flowing and hasn’t been covered by mulch, leaves or soil. Keep an eye on the face; a fresh bulge, a lean or joints pulling apart usually signals a drainage issue that’s cheaper to fix early. If a cap stone on a block wall works loose, glue it back down with the adhesive the block manufacturer calls for. On a low Cleves lot, take a look after high water to make sure silt hasn’t clogged the outlet. Walls next to a deck are a good reason to look over the posts and footings at the same visit, and our deck inspection covers both.
Natural boulder steps and retaining wall climbing a sloped yard

Homeowners on our walls and patios

Posted on Google Google
wanda boiano profile picture
wanda boiano
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
My husband and I are extremely happy with our new Fiberon deck. Steve and his crew did an exceptional job; their attention to detail is unsurpassed. We know we made the right choice selecting Building Character LLC to do the job. We highly recommend them!
Posted on Google Google
Don Biery II profile picture
Don Biery II
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Building Character replaced our deck which was original to the house. The crew lead was very friendly and answered my questions throughout the process and did very detailed work. Love our new deck!
Posted on Google Google
Noah Asher profile picture
Noah Asher
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Working with Building Character has been an amazing experience. They took our vision and made it a reality at an affordable price. We spontaneously added a 24ft diameter concrete stamped fire pit at mid build. They were so helpful and knowledgeable about the process, pricing and logistics on getting it accomplished without hindering the deck process. Absolutely amazing. The family is ready to party this fall. Thanks again for all your help.
Posted on Google Google
Nate E profile picture
Nate E
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We couldn’t be happier with our new deck! From start to finish, the entire team was professional, reliable, and easy to work with. They paid close attention to detail, kept us informed throughout the project, and did an excellent job keeping the work area clean. The finished deck looks beautiful and the quality of the workmanship is outstanding. They truly took pride in their work and made the whole process smooth and stress-free. We would highly recommend this company to anyone looking to have a deck built!
Posted on Google Google
Zelda Gamer profile picture
Zelda Gamer
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The deck work they did was amazing! Everything went really smoothly, was very professional, and the finished product looks amazing. Best company I’ve ever hired for deck improvements. Would definitely recommend and will absolutely return if something else comes up.
Posted on Google Google
Harlan Logan profile picture
Harlan Logan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Heard it was a great company, I give them two thumbs up, very inficient and straight to the point when it comes to building decks
Posted on Google Google
Alec Reser profile picture
Alec Reser
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have a toddler so it was important to us that we expand the usable space in our backyard. They removed a hot tub, bushes, and moved our drainpipe for us to make room for the patio. Overall, we're very happy with Building Character and the work they did especially considering they worked (6/15 - 7/2) through some pretty extreme heat. One last thing I'd like to highlight is that our original estimate included a gate at the top of the deck. When reviewing the contract, we didn't realize it was missing and so it wasn't installed when the rest of the deck was constructed. I'm happy to say that we worked with Building Character and they honored their estimate; we got the gate installed yesterday!
Posted on Google Google
Doobs Sanchez profile picture
Doobs Sanchez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We’re thrilled with how our new deck turned out. Dave and his crew did a wonderful job taking our old deck down and rebuilding a brand‑new one. They were respectful of our property, kept the work area clean, and made sure everything was picked up each day. All inspections passed smoothly. We truly appreciate their hard work.

“

Building Character did a great job on our new deck.Jose and Oliver were at our house every morning working hard until job was done,and was completed before the start date,i would recommend Building Character if you're in need of a new deck
Dave Hicks
Google review
The entire process from start to finish with Building Character was a great experience. The crew that built our deck were great. Thanks Jennifer for your guidance in the planning stages and color choices. We are so happy with the outcome of our deck! Our deck is ABSOLUTELY BEAUTIFUL!!!!
Ashley Harris
Google review
Jared’s crew did a fantastic job building our deck. I couldn’t be happier. They were timely and careful and built a really solid deck. I would use them again in a heartbeat.
Adam Hickey
Google review

Questions about Cleves retaining walls

No range is published, because height, material, drainage and access differ too widely. Height usually weighs most, and on soggy Cleves ground the drainage work often adds more than people expect. The proposal written after the site visit itemizes every part.
In Cleves, nearly always water. Saturated ground pushes harder than dry ground, and ice forming behind it shoves the face out of line over several winters. Washed stone, a perforated pipe and an outlet behind each wall go a long way toward preventing that.
Height, the load it holds back and local rules decide it. The local building department answers that for your parcel before work begins, and any permit or engineer’s plan it requires is on us to arrange.
Yes, with planning. The floodplain map comes first, because it may shape where the wall can go and what review applies. On low, wet ground, drainage and grading get extra care.
Block is efficient and handles curves and steps easily. Boulders look natural but need a machine to reach the spot. Natural stone or veneer fits a traditional house.
Yes, and on a sloped lot that’s often the smarter route. The wall establishes the grade, and the deck’s posts and stairs are positioned around it, so the two are planned as one project from day one.
Yes. Timber walls rot in damp ground over time. We take the old wall out, haul it off and rebuild in block or stone with real drainage, and the removal appears as its own proposal line.
That depends on the wall’s height, length, material and access, plus any permit or engineering review. The schedule is written into the proposal once the wall’s design is settled.
Jared and Jennifer Riddell, owners of Building Character LLC

Still have a question?

Call or text and you’ll talk with Jared or Jennifer, not a call center.
Jared and Jennifer Riddell, owners of Building Character LLC

Reviewed by Jared Riddell, Owner, Building Character LLC

Building decks across the Cincinnati tri-state since 1994. Ohio Residential Builders License CBRC006414.

Updated October 29, 2026

Tell us about your Cleves retaining wall

Send a few details and Jared or Jennifer will follow up to set up your free consultation or a virtual quote.
Jared and Jennifer Riddell, owners of Building Character LLC

1

We talk through the project

By phone or text, at a time that works for you.

2

We see the space

On site or by video for a virtual quote.

3

You get a written proposal

Design, permits and construction included, with a free 3D design.
Prefer to talk? Call or text (513) 592-1103, Mon–Sat 9 AM–5 PM.

Request your free quote

Ready to plan your deck?

Tell us how you want to use the space. We’ll take it from there with a free consultation or a virtual quote.

Design, permits and construction included. Free 3D design.

Get a free quote

Tell us about the deck or outdoor project you have in mind. Jared or Jennifer will follow up to set up your free consultation or a virtual quote.

Loading the quote form…

Prefer to talk? Call or text (513) 592-1103. Mon–Sat 9 AM–5 PM.