When the deck is new, we plan deck and cover as one structure: footings sized for the roof load, posts placed where the roof needs them, and a beam line that suits both. On an existing Florence deck, we first look at what is already there. A builder-grade deck from 1998 was sized to hold a patio set and a dozen guests. Nobody planned shingles on it, and its footings are often too small or too shallow for that job. Often the answer is new posts and footings for the cover, reaching under the local frost line, which the county building department sets; those posts stand independent of the old deck posts.
Then comes the tie-in at the house wall. On a two-story subdivision home, a shed roof can usually tie into the wall below the second-floor windows with room for a reasonable pitch. On a post-war ranch, the existing eave may sit low, so we look at a gable roof, a roof that extends from the existing one, or a freestanding structure. Before any lumber is ordered, you can view the new roofline in 3D, both from the lawn and from your kitchen window.
We match shingles or metal panels to your existing roof, hang gutters with downspouts aimed clear of the footings and foundation, and finish the underside in beadboard or something similar. Fans and lights are wired during construction, and a
deck lighting package can go in at the same time. Pergolas are built in wood or with composite-wrapped members, attached to the house or freestanding.