Building a wall on a Harrison slope
Most of the work disappears underground once the wall is finished. First comes a trench, then a crushed-stone pad tamped in lifts until the bottom course can rest perfectly level, and that course is partly buried so it cannot kick out at the toe. As courses rise, washed angular stone fills the zone behind them, and a slotted drain line along the bottom leads water out to daylight or another outlet. A layer of filter fabric stops Harrison’s fine valley silt from working into that stone. Higher walls sometimes need geogrid run back into the hillside in layers, and before the first shovel goes in we have asked the local building department two things: is a permit required, and does this wall call for an engineer’s stamp?
Material comes next. Segmental block was designed for retaining work, locks together dry, turns curves and steps easily and comes in faces that look at home beside newer Harrison siding. Natural stone or veneer over a structural core fits older houses near downtown. Boulders give a rugged, natural look on steep banks, though they need heavy equipment and a clear path into the backyard. Poured concrete gives a clean modern face where loads are heavier.
When a wall sits near a deck, we coordinate the two. Deck post concrete on our jobs goes down 30-plus inches, and it stays out of the stone-filled zone behind any wall. Sometimes the wall carries a patio under the deck; sometimes the deck stairs run down beside it. One 3D model holds both, so you can follow the path from deck boards down to lawn before we start. A single contract with us covers the drawings, the permits and the construction.