Weight comes first. Open rafters weigh little, while shingles, a ceiling, fans and a winter’s snow add up quickly. When the deck is new, the roof posts appear on the very first drawing, and their piers are poured with the deck’s, made wider for the load and set 30 or more inches down. On a deck that already exists, we check the posts, beams and footings before agreeing a roof can sit on it, and we add footings or a heavier beam where needed.
The second is where the roof meets the house. On older homes the options depend on the eave height, the window and door heads, and what the wall is built of. We can join the new roof to the old one, hang it from a ledger set beneath the gutter, or carry it on a separate beam and posts that leave the house wall alone. We choose based on the clearance under the new roof and how the water will run, then show you the result in 3D so you can see it from the yard before anything is ordered.
The third is finish. Columns can be wrapped to match existing porch posts, ceilings finished in beadboard-style or tongue-and-groove material, and roofing chosen to blend with the main house. Fan and light circuits are run while the rafters are still open. Screens are framed so panels can be serviced later. Where the covered space sits beneath an upper deck rather than on it, an
under-deck drainage trough turns the patio beneath into usable space in wet weather. Design, permits and construction are part of one proposal.