You won’t see the parts that do most of the work. The base trench is dug first, then filled with crushed gravel and compacted until the first row of units can sit dead level, partly buried so the wall can’t slide forward. Clean drainage aggregate fills the zone behind the units. A perforated pipe laid along the bottom of that stone takes water out to daylight or a suitable outlet, so the soil never has a chance to push with the weight of trapped rain. A layer of filter fabric separates that aggregate from the native clay. On taller walls, geogrid may be layered back into the fill, and the local building office tells us before work starts whether yours needs a permit or a stamped design.
On suburban lots, concrete wall block carries most of the load. The units lock together dry, come in split-face or tumbled faces in tones chosen to suit brick and vinyl siding, and can bend, turn a corner or step down for stairs. Boulders placed by machine read as part of the landscape and leave gaps for planting. Hand-laid stone, or veneer over a structural core, suits a house with stone on its front. Where the slope needs several feet held back, breaking it into two or three lower terraces is often kinder to the soil and the budget than one tall face.
The finishing work is part of the job: caps on the top course, steps built through the wall where a path crosses it, under-cap fixtures from our
landscape lighting work if you want the levels glowing after dark, and topsoil and planting on each level. If pavers are part of the plan, we lay them in the same project so grades and drainage line up.