How we build cover over a Liberty Township deck
On a new deck, the cover is designed in from the first drawing. Roof posts land on their own footings, at least 30 inches deep, and the beams under them are sized for the roof weight, snow and wind as well as the people on the deck. On an existing deck, we check what’s there first: post size, beam size and span, footing depth and the ledger. If those were built only for a deck, we add posts and footings, upgrade the beam or install a separate structure for the roof so the old frame doesn’t carry loads it wasn’t built for. That work is listed on its own line in the proposal.
The tie-in at the house wall deserves as much care as the posts. On two-story homes common in the township, a roof off the back can tie in under a second-floor window, against siding, or into the existing eave. We flash that joint carefully and plan the gutters so water lands away from the deck footings and the walkout patio below. Shingles are usually matched to the house; metal is an option where the pitch is low. Ceilings can be beadboard, tongue-and-groove or a vinyl soffit, with blocking for a fan and wiring for lights.
Pergolas go up faster and lighter. We build them in pressure-treated wood, cedar or a composite-wrapped frame, attached to the house or freestanding, with rafter spacing chosen for how much shade you want. Screened rooms add a roof, framed screen panels and a door, and we often pair them with composite boards because the floor stays shaded and slow to dry. A free 3D model shows the new roofline from the yard before anything is ordered.