The strength of a wall is mostly hidden. We open a trench along the line of the wall, pack crushed stone into it in lifts until it is firm and flat, and set the first course down into the soil rather than on top of it. As each course rises, open-graded stone fills the space behind it, a perforated pipe runs along the bottom, and a fabric liner keeps the hillside’s fine soil from migrating into the gravel. The pipe has to exit somewhere, and on a Loveland hillside we trace that outlet down the slope so the runoff doesn’t just start a new gully below. A tall wall may get layers of geogrid in its backfill. Before any excavation, we ask City of Loveland Building & Zoning whether the wall you have in mind calls for a permit, an engineer, or both.
Where the wall supports a deck, a stair or a patio, we design them together. Each deck footing reaches a minimum of 30 inches deep and stays outside the wall’s drainage stone, so neither one undermines the other. Stairs can run through a terraced wall with block or stone treads, and a patio set on the new level can be
stone or pavers or stamped concrete. Engineering decks for steep lots is something we specialize in, which is why so many of our Loveland walls end up beneath decks we built.
Finishing touches come last: a wide cap that doubles as seating, planting pockets, low-voltage lights under the cap, or a set of boulders to soften the end of the wall. Each wall is modeled in 3D before excavation, so you can see the levels, the steps and how the deck sits above it all.