The house wall is where design begins. On a one-story home, the eave may sit only a few feet above the deck, so a roof attached below the gutter would leave too little headroom; in that case we often tie into the main roof itself or carry the new roof on its own beam. On a two-story house, upstairs windows limit how high a ledger can go and how steep the new roof can be. Those measurements feed a 3D model that lets you see the new roofline from the yard, from the kitchen and from the street.
Load is the second piece. A pergola is light, but a shingled roof with a ceiling and fan is heavy, and it catches wind. Each roof post therefore lands on concrete poured past the 30-inch frost mark and widened to suit what it carries. If the cover goes on a deck that’s already built, we check the existing posts, beams and footings before promising anything. Sometimes they can carry the roof; often we add new posts and footings beside them.
Water is the third. Every square foot of new roof sheds rain, so gutters and downspouts are planned to carry it clear of the deck, the patio and the foundation. Electricians run fan and fixture circuits while the rafters are still bare. Where a Madeira deck stands over a lower patio,
under-deck drainage makes that lower level a dry second room. Your Madeira proposal bundles design, permits and construction together.