Before any digging, we have the underground utilities marked and look at where the property’s drainage runs, since subdivision lots often carry swales or easements along the back and sides. Then we excavate a trench for the base, fill it with crushed gravel in layers, and compact each layer so the first course of block or stone sits dead level. That first course goes partly below grade, which locks the wall in place at the bottom.
As the wall rises, the space behind it is filled with clean, angular drainage stone rather than the soil that came out of the hole. A perforated pipe at the base of that stone collects water and carries it to daylight or another outlet, and landscape fabric keeps fine soil from clogging the stone over time. Taller walls may need geogrid reinforcement laid between courses and into the backfill, or an engineered design; the city tells us which applies to yours before work begins.
Where the wall meets a deck, we plan both together. Deck footings near a wall are placed so they don’t load the wall or get undermined by its excavation, and every deck footing still goes at least 30 inches below grade. A wall can create the level pad for a
paver patio under a walkout, frame a set of garden steps down to the lawn, or carry a seat-height cap that doubles as seating. Low-voltage
landscape lighting can be built into the cap or the face during construction.