Our deck building process

Six stages take your deck from a first conversation to a signed-off inspection and a last walk across the finished boards. Here is what happens at each one, what you do, and what we handle for you.
Gloved hands checking a deck ledger connection and joist hangers with a level

Six defined stages

OH license CBRC006414

A defined path from first call to final sign-off

Building a deck involves more decisions than most homeowners expect: footing depth, ledger flashing, board spacing, railing height, stair layout, the permit drawing and three separate inspections. Our deck building process puts those decisions in a fixed order so nothing gets settled too late and nothing gets skipped. Whether the project is a ground-level platform or a two-story custom deck on a sloped Cincinnati lot, the stages stay the same.

Design, permits and construction are included in every Building Character proposal. You will not receive a separate bill from a designer or a permit expediter, and the price you approve already counts the drawings and permit filing. As owners, Jared and Jennifer Riddell keep tabs on your job from the first visit through the last walkthrough, so the people who heard your goals at the start are the ones checking the finished deck against them.

The six stages

1Free consultation, on site or virtual
2Custom design with a free 3D model
3Permit drawings and filing
4Construction by our crews
5Building department inspection
6Final quality walkthrough

Stage 1 in short

What you doShow us the yard, share how the deck will be used, mention budget and any HOA rules
What we doAssess house, grade, sun and drainage; inspect any existing deck
IncludedThe visit or video call, at no charge

Stage 1: Free consultation, in person or on video

Everything starts with a conversation about how you plan to live on the deck. Grilling for two needs a different shape than hosting twenty for graduation, and a hot tub changes the framing underneath. During an on-site visit we look at the back of the house, the door you will walk out of, the slope of the yard, the sun through the afternoon, where downspouts drain and what sits below any existing deck. If you have an old deck, we check its ledger, posts and footings so you know whether a resurfacing, a repair or a full rebuild makes sense.

A consultation costs nothing. If a visit is hard to fit around work, we can do the same conversation over video and you can send photos and a few measurements instead. Bring screenshots of decks you like, a rough budget, and any notices from your HOA or architectural review board. We leave with enough information to draw a first layout and prepare a written proposal with a price range tied to specific materials.

Stage 2: Custom design and a free 3D model

Design is where your notes turn into dimensions. We sketch the footprint, decide where stairs land, locate posts so they stay out of sight lines and walk paths, and plan for any roof, pergola, lighting or patio that will connect to the deck later. Material choices get settled here as well. Wood options include pressure-treated pine, cedar and hardwoods; composite comes from Trex, Fiberon, Deckorators or TimberTech; PVC from AZEK or TimberTech; railing in aluminum, composite, cable or wood.

Every project includes a free 3D design. Seeing the deck rendered against your actual siding, windows and roofline is usually what settles the tough calls, like whether a 12-foot depth feels cramped or whether a picture-frame border reads better in a darker tone. Jennifer often leads this stage and helps with color pairing. Changes are expected. We revise the layout until it fits how you live, then update the proposal so the number matches the design you approve. If you want to experiment on your own first, our deck design tools page has a free online designer.

Stage 2 in short

What you doReview the layout and 3D model, pick boards, railing and color, ask for changes
What we doDraw the plan, build the 3D design, revise and price it
IncludedLayout drawings, the 3D design and revisions

Stage 3 in short

What you doSign the proposal; send HOA forms if your neighborhood has them
What we doPrepare permit drawings, file and track the application, answer reviewer questions
IncludedPermit drawings and filing; the permit fee is listed in your proposal

Stage 3: Permits, drawings and approvals

Once you approve the design, we prepare the construction drawings a building department expects: footing sizes and depths, beam and joist sizes, ledger attachment, stair geometry and guard heights. Paperwork is our side of the job, so our office takes it from here: we pull the permit with the local building department. Ohio permits every attached deck, however low. The exemption for freestanding decks is narrow (low, small and not serving a required exit), and setback rules from your zoning code apply regardless.

Which office reviews your plans depends on where you live. For unincorporated Hamilton County, plans go to Hamilton County Buildings & Inspections; city neighborhoods go through City of Cincinnati Buildings & Inspections; the Kentucky counties and Dearborn County in Indiana run separate offices of their own. Many newer subdivisions have architectural review; we prepare the drawings they ask for. Also, steep, slide-prone lots inside Cincinnati’s Hillside Overlay Districts also call for a geotechnical pre-consultation before the permit moves forward. Review times are set by each office, so we file promptly and keep you posted on where your application stands.

Stage 4: Construction by our own crews

With the permit approved, our crews arrive and lay out the deck with stakes and string so you can see the footprint on the ground. Demolition of any old deck comes first. That tear-out and disposal is free with a replacement of equal or larger footprint. Footings follow. On Ohio jobs in our area, every hole is dug to a depth of at least 30 inches. For Kentucky and Indiana homes, concrete piers bear on undisturbed soil below the local frost line, which the county building department sets. Hillside lots may need deeper footings or helical piers, confirmed on site.

Framing comes next, with a flashed ledger where the deck meets the house and joists spaced to the decking manufacturer’s requirement. Then boards, borders, stairs, railing, skirting and any lighting wiring. Crews keep the site organized, stack materials neatly, clean up at the end of each day and leave your driveway usable. Expect the build itself to take one to three weeks for most decks after approval arrives. Complexity of design, material lead times and the weather set where yours falls.

Stage 4 in short

What you doKeep pets and vehicles clear of the work area; tell us about irrigation or buried lines you know of
What we doDemolition, footings, framing, decking, railing, stairs, finish details and daily cleanup
IncludedLabor, materials in the proposal and free removal with a same-size-or-larger build

Stage 5 in short

What you doGive access to the yard on inspection days
What we doSchedule footing, framing and final inspections; fix anything flagged
IncludedAll inspection coordination through permit close-out

Stage 5: Inspection by the building department

Inspections are how the county or city confirms that the deck was built to the approved drawings and the residential code. Most jurisdictions inspect at least three times: the footing holes before concrete is poured, the framing before the boards cover it, and the finished deck at the end. We schedule each visit, meet the inspector when needed and make any correction the inspector asks for before moving on.

The footing inspection checks hole depth and diameter. The framing inspection looks at the ledger connection and flashing, joist hangers, beam bearing, post connections, joist spacing and hardware. The final inspection covers guard height, baluster spacing, stair rise and run, handrails and anything else on the permit. A passed final closes the permit, which puts your deck on the county or city record. A closed permit gives you a clean answer when a buyer or appraiser asks about the deck years from now.

Stage 6: Final quality walkthrough

With the final inspection passed, we set a time to stroll the deck together, one board after another. We check fastener lines, picture-frame corners, stair treads, railing posts and gates, lighting and drainage, and we fix any detail either of us catches before calling the job finished. This is also when we go over care: how to wash composite or PVC, when a wood deck needs sealing (we are happy to advise on stain and sealer, but we do not offer staining), and what to look for each spring.

You leave the walkthrough with your warranty paperwork. On qualifying projects (composite decking, aluminum railing) our extended labor and workmanship coverage runs 5–10 years, varying by material and job, and the manufacturer’s own product warranty sits alongside it. If anything covered needs attention later, our own team handles the warranty work. Then the deck is yours to use, and we are still a phone call away for questions or the next project.
Extended workmanship and labor warranties apply to qualifying new installations and major renovations using composite decking and aluminum railing. Terms typically run 5–10 years and vary by material and project; exact terms are provided in writing at consultation. Manufacturer warranties apply separately.

Stage 6 in short

What you doWalk the deck with us and point out anything you want adjusted
What we doPunch-list fixes, care guidance and warranty handover
IncludedThe walkthrough, final adjustments and written warranty terms

Start with photos

Pictures and a tape measure are enough to get a same-day emailed proposal.

Prefer a virtual quote?

If your schedule is tight or you just want a number before anyone visits, a virtual quote covers Stage 1 from your phone. You text or email pictures of the house, the yard and any old deck with a handful of measurements. Your written proposal is emailed back the same day. A virtual quote is accurate for planning and comparing materials. Before construction we still confirm footings, the ledger location and the grade in person, because those details decide the final structure.

How long each stage usually takes

Timelines below are ranges with conditions, not promises. Permit review and weather are the two things outside anyone’s control.
Typical timing for a Building Character deck project
StageTypical timingWhat moves it
ConsultationScheduled around your calendarOn-site visit or video call
Virtual quoteProposal emailed the same dayPhotos and measurements received
Design and 3D modelDepends on revision roundsHow many layout or material changes you want
PermitsSet by the building departmentOffice workload, HOA or design review, hillside review
Construction1–3 weeks after the permit is issuedSize, height, materials, add-ons and weather
InspectionsBooked with the jurisdictionInspector availability and any corrections
WalkthroughAt completionFinal inspection passed
Want a cost range before you call? Try the deck cost calculator.

0%

Fixed financing for one year, then a fixed rate

Pre-qualify through Hearth in under two minutes with a soft credit inquiry. Offers from 13 lenders, loans up to $100,000, funding in 1–3 days and no prepayment penalties.
Financing is offered through Hearth and its lending partners. Pre-qualification uses a soft credit inquiry and does not affect your credit score. Eligibility, rates and exact terms are confirmed before any work is scheduled.

5–10 yrs

Extended workmanship warranties

Labor coverage on qualifying composite decking and aluminum railing projects, transferable in most cases, with warranty work handled by our in-house team at no labor charge.
Extended workmanship and labor warranties apply to qualifying new installations and major renovations using composite decking and aluminum railing. Terms typically run 5–10 years and vary by material and project; exact terms are provided in writing at consultation. Manufacturer warranties apply separately.

Deck building process FAQs

Once permits are issued, the build portion is usually one to three weeks; bigger designs, specialty materials and rainy stretches push toward the long end. The design stage depends on how many revisions you want, and permit review time is set by your building department, so your proposal carries a schedule built on those conditions instead of a fixed date at the first visit.
Yes. The on-site or video consultation and the 3D design cost nothing, and you are under no obligation to sign. You get a written proposal with materials and price so you can compare it calmly.
No. Drawing the plans, submitting the application and following the review all fall to us. The permit fee appears in your proposal, and the whole filing is part of what you are paying us for.
Not usually. We need access to the yard, power and a clear path for materials. Most homeowners are home for the first day and the walkthrough, and we stay in touch by phone or text in between.
We make the correction the inspector asks for and arrange the re-inspection. Dealing with the inspector is our job, so you hear what was flagged, what we changed and when the deck passed.
Often, yes. Frozen ground and heavy snow can pause footing work, so a winter schedule depends on the weather more than a summer one does. One reviewer, Nicole Bennett, mentions Jose and the crew building her deck while it was cold.
Tell us right away. Some changes, such as a different railing color, are simple; others, such as moving stairs, can affect the permit drawings. We explain the effect on cost and schedule in writing before making the change.
Payment terms are set out in your proposal. Homeowners who prefer monthly payments can apply through Hearth, where pre-qualifying takes a soft credit inquiry, and eligibility and exact terms are confirmed before any work is scheduled. See deck financing.
Jared and Jennifer Riddell, owners of Building Character LLC

Still have a question?

Call or text and you’ll talk with Jared or Jennifer, not a call center.

Ready to start with a free consultation?

Send a few details and Jared or Jennifer will follow up to set up your free consultation or a virtual quote.
Jared and Jennifer Riddell, owners of Building Character LLC

1

We talk through the project

By phone or text, at a time that works for you.

2

We see the space

On site or by video for a virtual quote.

3

You get a written proposal

Design, permits and construction included, with a free 3D design.
Prefer to talk? Call or text (513) 592-1103, Mon–Sat 9 AM–5 PM.

Request your free quote

Ready to plan your deck?

Tell us how you want to use the space. We’ll take it from there with a free consultation or a virtual quote.

Design, permits and construction included. Free 3D design.

Get a free quote

Tell us about the deck or outdoor project you have in mind. Jared or Jennifer will follow up to set up your free consultation or a virtual quote.

Loading the quote form…

Prefer to talk? Call or text (513) 592-1103. Mon–Sat 9 AM–5 PM.