Aluminum railing we install runs about $70 to $130 per linear foot. Where your project lands depends on the line and profile, how many corners, gates and stair sections the layout has, and whether you add lit post caps. Your proposal lists the railing as its own line, and the cost calculator on our site can estimate the whole deck.
Often, yes. If the posts, rim joist and framing are sound, we remove the wood railing and install aluminum in its place. We check that wood first, because a loose railing usually traces back to soft framing rather than the rail itself. If repairs are needed, we explain what we found and price them in the proposal.
Each suits a different goal. Preferred Railing Systems offers classic Georgian and Raleigh profiles in black, white and bronze and is a cost-effective choice for most decks and porches. Westbury gives you a wide range of aluminum and vinyl styles. Key-Link adds cable infill options and a durable powder-coated finish. We bring samples of all three to your consultation.
It depends on your house and what you look at from the deck. Black recedes against a lawn or a tree line, white matches painted trim, and bronze sits well with brick and stone. Preferred offers all three in a textured finish. We hold samples against your siding in daylight before you decide, and the 3D design shows the color on the whole deck.
Yes. Preferred Railing Systems makes ADA-compliant handrails that we mount along stair runs, so there is a continuous rail to hold onto. They make sense when an older parent visits often, when someone in the house is recovering from surgery, or when you want a firmer grip on wet stairs. We plan them during design so the posts land in the right spots.
It depends on the scope and the building department. On the Ohio side, a deck fastened to the house needs a permit no matter how low it sits, and the railing is checked at the final inspection of a new deck. A railing replacement on its own may or may not need one, so we ask the building department that covers your address and pull a permit if they want one.
A railing on its own is usually a shorter job than a full deck, though the schedule depends on how much railing there is, the number of stair sections, any repairs to the framing and the lead time on your line and color. On a new deck, railing goes on near the end of a build that usually runs one to three weeks after the permit is issued, depending on design, materials and weather.
Yes. When an aluminum railing project qualifies, Building Character covers the workmanship and labor for 5 to 10 years, depending on the material and the project. Coverage can be transferred in most cases, and our in-house team does any warranty work with no labor charge. Preferred, Westbury or Key-Link cover the railing itself under their own terms. The exact terms come to you in writing at the consultation.
Yes. Lit post caps and stair lights are planned with the railing, so wiring runs through the posts and framing before the decking goes down. We also install privacy screens and benches that tie into the same posts. Planning it all at once keeps the top line of the railing even and the finishes consistent across the deck.
Wash it with mild soap and water a couple of times a year and rinse off pollen and grill residue as it builds up. There is nothing to sand or paint. After winter, check that gates still latch and that caps are snug, and call us if a post ever feels loose so we can look at the framing behind it.