They are part of the same company. The AZEK Company makes TimberTech products, and AZEK’s PVC decking is now sold as TimberTech Advanced PVC in the Harvest, Harvest+, Landmark and Vintage collections. Many homeowners still ask for it as AZEK, and either name points to the same boards. Building Character is a certified AZEK and TimberTech installer.
AZEK and TimberTech Advanced PVC decks we build run about $55 to $80 per square foot installed. The collection, the board pattern and the frame decide where you fall in that range. Height, railing, stairs and pattern work can move the total as much as the board choice. Before we meet, you can run your own numbers through our cost calculator.
According to TimberTech’s written warranty, the Advanced PVC collections carry a lifetime limited product warranty for single-family residential owners, covering manufacturing defects that cause splitting, cupping, splintering, cracking, rot or termite damage. A separate 50-year limited fade and stain warranty covers color change beyond a measured limit and staining from food and drink cleaned up within one week.
No. TimberTech’s warranty says the manufacturer will replace defective boards or refund their purchase price, but it is not responsible for labor or removal costs. That is one reason our own workmanship and labor warranty matters on qualifying composite and PVC projects. Exact terms of ours are provided in writing at your consultation.
TimberTech’s Advanced PVC product warranty can be transferred once, to a later buyer of the property, within five years of the original purchase. After that window it stays with the original owner. Our own workmanship warranty is transferable in most cases, and we explain both in writing before you sign.
The manufacturer’s warranty excludes damage from improper installation, improper gapping and fasteners it did not supply. A certified installer works to those rules on every job. Our crews know the joist spacing, gapping and fastener requirements for each collection, and we keep your product and warranty paperwork together for you at handover.
It suits pool decks well, because PVC has no wood content to soak up splash water and lighter colors stay more comfortable in sun. We plan drainage, the border along the coping and the step layout at design, and we check the building department’s requirements for the pool area before the permit goes in.
They can. Low-emissivity glass can reflect concentrated sunlight onto decking, and TimberTech’s warranty excludes damage from that kind of reflected heat. If large windows or patio doors face the deck, we look at the angle on site and talk through screens, shading or layout changes before we build.
With the permit in hand, building an AZEK deck usually takes our crew one to three weeks, and the design, the collection’s availability and the weather decide where in that range it falls. Pattern work, a second story or an under-deck system adds time. Your proposal includes a schedule built around your project.