Composite and vinyl railing runs about $60 to $110 per linear foot installed across the tri-state. The total depends on how many feet of rail the deck needs, how many stair sections and posts there are, and whether the existing framing needs repair before the rail goes on. The cost calculator will give you a planning figure, and your written proposal gives the exact one.
Often, yes. If the deck frame is sound, we remove the wood railing and mount a composite or vinyl system to the rim joist and new blocking. We check every post location and the top of the stairs first. If the framing is soft or undersized, we tell you, and we price the repair so you can decide before work starts.
It comes down to the look you want and how much you want to see through it. Composite and vinyl suit white trim, traditional homes and decks where the rail should match the boards. Aluminum is slimmer and comes in black, white and bronze from Preferred. We carry samples of each to the consultation and hold them up beside your own siding.
Very little. Wash it with soap, water and a soft brush once or twice a year, and rinse off pollen in spring. It never needs stain or paint, which is why many homeowners make the switch from wood. We go over care for your specific system at the final walkthrough.
Usually it can, or it can contrast on purpose. We choose railing colors with the decking samples in hand and hold them against the boards, siding and trim in daylight. Some homeowners want the rail to blend in; others want a white rail that outlines the deck the way window trim outlines a house.
It depends on the town and the scope of work. Ohio requires a permit for any new attached deck, however low it sits, and the rules across the river and in Indiana work much the same way. For railing-only work we confirm with the local building department and pull a permit when one is required. Either way, the railing is built to the residential code in force.
The residential code where you live sets that, and it depends on how far the deck sits above the ground. We build every guard to the code in force in Ohio, Kentucky or Indiana, and the building inspector checks the height, the posts and the baluster spacing before the project closes out.
Yes. Post caps come in several shapes, and lit post caps or stair lights can be wired into the railing during installation so no cable shows. If you think you might want lighting later, tell us now. Running wire before the posts are closed up is much easier than adding it after.
Railing replacement on an existing deck is a shorter job than a new build. Paired with a new deck, it is part of a build that generally wraps up in one to three weeks after permits come back; the design, the products and the weather decide where in that window you fall. The proposal spells out your schedule.
Yes, through Hearth, which works with 13 lenders. Pre-qualifying takes less than two minutes and involves only a soft credit inquiry, and there are no prepayment penalties. The first year is 0% fixed, followed by a fixed rate. We confirm eligibility and the exact terms with you before the work is put on the calendar.