Structure comes first. A roof over a deck needs posts that carry load straight to footings of their own, so we do not rest them on decking or on a joist chosen for convenience. On a new build those footings are dug with the deck footings; on an existing deck we expose the frame where each post will sit and add footings and beams where the old ones fall short. On the Ohio side footings go 30 inches or more below grade, and in Kentucky and Indiana we follow the depth the county sets. The beams at the top of the posts are sized for the roof span and the snow it will hold.
The roof shape follows the house. A shed roof slopes away from the wall and usually tucks under second-story windows. A gable roof gives more height and a peak that can match the main roofline, which suits a deck off a ranch or a split-level. Where the roof meets the house, we tie it to the wall framing or into the existing roof and flash the joint so water stays outside. We try to match the shingles on the house where that material is still available.
Underneath, you choose how finished it feels. Many homeowners pick a wood ceiling, a ceiling fan and recessed or beam-mounted lights, wired during framing so the cables are hidden. Some add a wall-mounted TV or an
outdoor fireplace at one end, and a stone counter with a grill fits well under the roof edge. Gutters and downspouts take roof water away from the deck footings and the foundation.
Our office prepares the permit set and files it with Hamilton County Buildings & Inspections, the City of Cincinnati or the department that covers your address, and each stage is inspected. Design, permits and construction are included. A covered deck usually takes longer than an open one because the roof is its own stage of framing, and your proposal lays out the schedule.