What a deck replacement includes
A replacement starts with taking the old deck apart. We remove the boards, railing, stairs, framing and posts, and pull or abandon the old footings as the new design requires. We haul everything away, and there is no charge for that part when the replacement matches or exceeds the old footprint. We look closely at the house wall where the old ledger was attached, since that is often where water damage hides, and repair the sheathing or rim joist before anything new goes up.
The new structure is built to current code. Each footing hole goes to the depth the code calls for: on the Ohio side that is two and a half feet or deeper, and across the river or in Indiana it is whatever frost depth the county has set. Posts, beams and joists are sized for the span and for whatever the deck will carry, and the ledger is bolted and flashed against the house. If the yard slopes, we plan the footings for the grade; hillside lots are a specialty for us.
On top, you choose the surface. Many replacements move from wood to capped composite or PVC (Fiberon, AZEK, Trex, TimberTech or Deckorators), which takes the staining cycle off your list. Pressure-treated pine, cedar and hardwoods like ipe are still good options if you prefer wood. Railings can be aluminum from Key-Link, Westbury or Preferred Railing Systems, composite or vinyl, cable, or wood. Stairs, landings, skirting and fascia are rebuilt to match.
Because you are starting fresh, this is the time to add what the old deck couldn’t. That might be a larger footprint, a second level, wiring for lighting, a pergola or covered roof, a privacy screen or under-deck drainage to keep rain off the patio underneath. Design, permits and construction are included, and the free 3D design lets you see the new deck in place of the old one before work begins.