Deck Resurfacing in Cincinnati, OH

Resurfacing replaces the worn boards, and often the railing and stair treads, while keeping a frame that is still in good shape. For homeowners whose deck is solid underneath but tired on top. It starts with a visit where we check the structure before recommending anything.
Deck resurfacing in progress with new composite boards on an existing frame and taped joists

Frame inspected before we quote

Certified TimberTech installer

A new surface on the deck you already have

Plenty of decks around here have a frame that is still doing its job and boards that have given up. The surface is gray, splintered or cupped, the stain peels a little more each year, but the posts are straight and the joists are dry. In that case, tearing out the whole structure can be more than you need. Deck resurfacing puts new boards on the existing frame, and it is a regular part of our custom deck building work, especially on established streets like those in Madeira.

The key word is sound. New composite boards on a failing frame just hide the problem for a while, so we never quote resurfacing without looking underneath first. If the structure needs repair, we say so and show you why.

Could resurfacing work for your deck?

What happens during a deck resurfacing

We begin under the deck. Before quoting, we check the footings, posts, beams, joists and ledger, probe the wood for rot, look at the hangers and fasteners and confirm the ledger is bolted and flashed. Then we measure the joist spacing. Many older wood decks were framed with joists farther apart than composite boards allow, and diagonal layouts need them closer still, so spacing decides what can go on top. When a few joists are weak or the spacing is wide, we can sister new joists alongside the old ones or add blocking. When the problems run deeper, we recommend repair or replacement instead.

Once the frame checks out, the old boards come off and we deal with what they were covering. We replace any damaged joists, tighten or replace loose hardware and apply joist tape to the tops of the framing so water doesn’t sit where the new boards are fastened. That tape is one of the details that helps an existing frame last as long as the new surface on it.

Then the new decking goes down. For most people the pick is a capped board from AZEK, Deckorators, Trex, Fiberon or TimberTech, and that ends the staining cycle; pressure-treated pine, cedar and hardwood are options too. We install with hidden clips or color-matched screws, add a picture-frame border to hide board ends and finish the edges with fascia. Stair treads and risers are usually replaced to match.

Resurfacing is also a good time to update the railing. We often replace worn wood rails with aluminum, composite or cable railing and run wiring for post-cap or stair lights while the boards are off. Because the frame stays, the project is usually shorter than a full new deck. Design, permits and construction are included, and we check with the local building department whether your resurfacing needs a permit; railing and stair changes often do.
Before and after: a weathered deck surface replaced with brown composite decking beside sliding doors

Decisions to make when you resurface

A resurfacing keeps the footprint, so the choices are mostly about the surface and the details around it. We bring samples and go through each one.
Before and after: weathered, split wood deck boards replaced with gray composite decking

01

Composite, PVC or wood boards

Capped composite and PVC only need washing and hold their color. Wood costs less up front and needs regular finishing. Board choice also sets the joist spacing the frame has to meet.

02

Straight boards or a pattern

Straight boards usually fit the existing joist layout. A picture-frame border is easy to add. Diagonal or herringbone patterns need closer joists and more blocking, which we check before you commit.

03

Keep the railing or replace it

If the railing is sound and you like it, it can stay. Many homeowners switch to aluminum or cable at the same time, since the posts are easier to reach with the boards off.

04

Stairs

Treads and risers almost always get replaced to match the new deck. If the stringers are tired or the stairs are steep, we may recommend rebuilding them entirely.

05

Lighting while it's open

With the boards off, running low-voltage wire for stair and post-cap lights is straightforward. Adding it later means working around finished decking.

How a deck resurfacing comes together

01

Frame check

We get under the deck and check footings, posts, beams, joists, ledger and hardware, and measure joist spacing against the boards you are considering.

02

Proposal and samples

You get a written plan that covers any frame work, the new decking, railing and stairs, with samples so you can choose colors in your own light.

03

Permit if needed

We confirm with the building department whether your scope needs a permit and take care of it when it does.

04

Tear-off and frame prep

Old boards come off. We replace weak joists, add blocking where needed, fix hardware and tape the tops of the joists.

05

New decking and trim

New boards go down with clips or screws, plus the border, fascia and new stair treads and risers.

06

Railing and walkthrough

Railing and lights go on, and we go over the finished surface together, including the right way to wash composite.

What affects the cost of resurfacing

Resurfacing usually costs less than a full new deck, since the footings and most of the frame stay in place. How much less depends on the condition of the frame and what you put on top. The board line makes the biggest difference, followed by whether the railing and stairs are replaced too. Frame work, such as sistered joists or added blocking for a pattern, is listed separately in your proposal, so you can see exactly what goes into the price.
Your proposal gives you the number, after we see the site.

What we check before quoting a resurfacing

Design, permits and construction are included in every Building Character proposal.

Why the frame matters in Cincinnati weather

The boards on an older deck usually wear out first because they take the sun, rain and snow directly. The frame lasts longer, but it is not immune. Between the roughly 57 hard freezes and thaws each winter and humidity that averages 75–78%, water that sits on joist tops or behind the ledger slowly works into the wood, especially under boards that have been fastened through for years.

That is why resurfacing here is never only about the surface. We look for soft spots around old screw holes, dark stains along the ledger and posts that have moved, and we tape the joists before new boards go down. On a shaded deck that stays damp, we may suggest a PVC board. If the inspection finds more than a resurfacing can solve, deck repair or a full rebuild is the next conversation. If you are adding a border while the old boards are off, see deck inlays and picture framing.

We check the frame before we quote

A resurfacing is only as good as the structure under it. Before recommending new boards, our team looks at every footing, post, beam, joist and the ledger, and measures the joist spacing. If something underneath needs attention, you hear about it from us first, with photos, before you decide.
Deck resurfacing in progress with new composite boards on an existing frame and taped joists
Resurfacing underway: new composite boards going onto an existing frame with taped joists
Before and after: a weathered deck surface replaced with brown composite decking beside sliding doors
Weathered surface next to sliding doors, shown again with new brown composite boards
Before and after: a faded deck replaced with dark brown composite decking and black aluminum railing
A faded deck before, then resurfaced in dark brown composite with black aluminum railing

Reviews from homeowners with a resurfaced deck

Posted on Google Google
wanda boiano profile picture
wanda boiano
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
My husband and I are extremely happy with our new Fiberon deck. Steve and his crew did an exceptional job; their attention to detail is unsurpassed. We know we made the right choice selecting Building Character LLC to do the job. We highly recommend them!
Posted on Google Google
Don Biery II profile picture
Don Biery II
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Building Character replaced our deck which was original to the house. The crew lead was very friendly and answered my questions throughout the process and did very detailed work. Love our new deck!
Posted on Google Google
Noah Asher profile picture
Noah Asher
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Working with Building Character has been an amazing experience. They took our vision and made it a reality at an affordable price. We spontaneously added a 24ft diameter concrete stamped fire pit at mid build. They were so helpful and knowledgeable about the process, pricing and logistics on getting it accomplished without hindering the deck process. Absolutely amazing. The family is ready to party this fall. Thanks again for all your help.
Posted on Google Google
Nate E profile picture
Nate E
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We couldn’t be happier with our new deck! From start to finish, the entire team was professional, reliable, and easy to work with. They paid close attention to detail, kept us informed throughout the project, and did an excellent job keeping the work area clean. The finished deck looks beautiful and the quality of the workmanship is outstanding. They truly took pride in their work and made the whole process smooth and stress-free. We would highly recommend this company to anyone looking to have a deck built!
Posted on Google Google
Zelda Gamer profile picture
Zelda Gamer
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
The deck work they did was amazing! Everything went really smoothly, was very professional, and the finished product looks amazing. Best company I’ve ever hired for deck improvements. Would definitely recommend and will absolutely return if something else comes up.
Posted on Google Google
Harlan Logan profile picture
Harlan Logan
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
Heard it was a great company, I give them two thumbs up, very inficient and straight to the point when it comes to building decks
Posted on Google Google
Alec Reser profile picture
Alec Reser
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We have a toddler so it was important to us that we expand the usable space in our backyard. They removed a hot tub, bushes, and moved our drainpipe for us to make room for the patio. Overall, we're very happy with Building Character and the work they did especially considering they worked (6/15 - 7/2) through some pretty extreme heat. One last thing I'd like to highlight is that our original estimate included a gate at the top of the deck. When reviewing the contract, we didn't realize it was missing and so it wasn't installed when the rest of the deck was constructed. I'm happy to say that we worked with Building Character and they honored their estimate; we got the gate installed yesterday!
Posted on Google Google
Doobs Sanchez profile picture
Doobs Sanchez
Google star 1Google star 2Google star 3Google star 4Google star 5Trustindex verifies that the original source of the review is Google.
We’re thrilled with how our new deck turned out. Dave and his crew did a wonderful job taking our old deck down and rebuilding a brand‑new one. They were respectful of our property, kept the work area clean, and made sure everything was picked up each day. All inspections passed smoothly. We truly appreciate their hard work.

“

Wow! We were super impressed from start to finish with our deck remodel project. Jared and Jennifer helped to redesign pieces of our deck and were patient with some changes we requested. They are professionals and the quality of our deck is fantastic. The install team that did the actual labor were also top-notch and professional. We added lights to the stairs and to some drop-down areas which was also a game changer.Highly recommend them and Building Character LLC . Great work!!!
Joel Engelmeier
Google review
Amazing experience all around. Took my unique problem and came up with several solutions. Talked it through, reviewed, and implemented quickly and efficiently. I wouldn't hesitate to call on them again
Ross Humphreys
Google review
We are so excited with our new deck! Building Character is a great company to work with. From the initial estimate to the final inspection they have been exceptionally professional and attentive to our needs. The deck building crew was great! They tore down and built our new deck in just one week! You can tell that they really take pride in their work. Everything was done to perfection and they left the work site spotless. I would highly recommend Building Character for your next project.
Donna Benesch
Google review

Deck resurfacing questions

Deck resurfacing means removing the old boards and installing new decking on the existing frame. Railing, stair treads and fascia are often replaced at the same time. It works when the footings, posts, beams and joists are still sound.
You won’t know for sure until someone looks underneath. A deck that feels solid can still have rot at the ledger or soft joists. We inspect the frame, check joist spacing against the new boards and tell you plainly whether resurfacing will work.
Often, yes, provided the structure is in good condition and the joists are close enough to meet the composite manufacturer’s requirements. Older decks sometimes have joists too far apart, and we can add or sister joists to close the gaps. We also tape the joist tops to protect the wood under the new boards.
Usually, since the footings and most of the frame stay in place. The savings depend on how much frame work is needed and what decking and railing you choose. Your proposal lists the frame work, decking and railing separately so you can compare options.
It depends on the scope. Board replacement alone may not, while replacing railings, stairs or structural parts often does. We check with the local building department for your project and handle the permit if one is needed.
Resurfacing is generally shorter than building a new deck because the footings and frame are already there. The schedule depends on the size of the deck, any frame repairs and the weather, and your proposal includes a timeline.
Yes. A border is one of the easiest upgrades during a resurfacing and hides the cut ends of the boards. It may need a little extra blocking at the perimeter, which we add while the old boards are off.
You get photos of the problem and a plain explanation of the options. Small issues like a few weak joists can be fixed as part of the resurfacing. If the damage is widespread, we will recommend structural repair or a full replacement.
If the railing is loose, worn or no longer matches what you want, resurfacing is a good time to replace it, since the posts are easy to reach with the boards up. Aluminum, composite and cable railing all pair well with new composite decking.
Jared and Jennifer Riddell, owners of Building Character LLC

Still have a question?

Call or text and you’ll talk with Jared or Jennifer, not a call center.
Jared and Jennifer Riddell, owners of Building Character LLC

Reviewed by Jared Riddell, Owner, Building Character LLC

Building decks across the Cincinnati tri-state since 1994. Ohio Residential Builders License CBRC006414.

Updated October 29, 2026

Describe the deck you'd like resurfaced

Send a few details and Jared or Jennifer will follow up to set up your free consultation or a virtual quote.
Jared and Jennifer Riddell, owners of Building Character LLC

1

We talk through the project

By phone or text, at a time that works for you.

2

We see the space

On site or by video for a virtual quote.

3

You get a written proposal

Design, permits and construction included, with a free 3D design.
Prefer to talk? Call or text (513) 592-1103, Mon–Sat 9 AM–5 PM.

Request your free quote

Ready to plan your deck?

Tell us how you want to use the space. We’ll take it from there with a free consultation or a virtual quote.

Design, permits and construction included. Free 3D design.

Get a free quote

Tell us about the deck or outdoor project you have in mind. Jared or Jennifer will follow up to set up your free consultation or a virtual quote.

Loading the quote form…

Prefer to talk? Call or text (513) 592-1103. Mon–Sat 9 AM–5 PM.