Everything on a hillside deck starts at the footings. We study the grade from the house to the far corner of the deck, note where water runs, and look for signs of soil movement. Concrete footings are set below the frost line, which in Southwest Ohio means no shallower than 30 inches, while on the Kentucky and Indiana side the local building department sets the required depth. Where the ground is soft, very steep or hard to dig, helical piers are an option. These are steel shafts screwed into the soil until they reach firm bearing, and whether your site calls for them is something we confirm on site, not on the phone.
Above the footings, the frame has to deal with posts of very different heights. Tall downhill posts need larger sizes, cross bracing and solid beam connections so the deck doesn’t sway. On some steep sites we use steel beams or full steel framing to cut down on the number of posts and keep the area below open. The ledger at the house is flashed and bolted the same as any deck we build, but on a slope it often carries a bigger share of the load, so we check the rim and foundation closely.
Inside the City of Cincinnati, the city’s Hillside Overlay Districts cover steep, slide-prone ground, and a lot there must have a geotechnical pre-consultation before any deck permit is granted. We flag that early so it doesn’t stall the schedule. Stairs on a hillside deck often run in two or three flights with landings, following the hill down to the yard. A
retaining wall at the base can level an area for a patio below.
We put design, permits and construction into a single hillside proposal, and the old deck on the slope comes down and gets hauled off for free when the replacement is as large or larger.