Budget roughly $55–80 a square foot, installed, for PVC and premium composite decking. Height, railing, stairs and extras such as lighting have a big effect on the total. In our own planning figures, roughly $67,000 is what a 480-square-foot PVC deck reaches at second-floor height once it has cable rail, fourteen steps, lights and a dry space below. Your written proposal shows the exact figure.
Composite boards blend wood fiber and plastic under a protective cap. PVC boards are fully synthetic, with no wood fiber at all. That makes PVC lighter and less prone to holding moisture, which is why we often recommend it for shaded or wet locations. Composite usually costs less.
We install AZEK and TimberTech Advanced PVC, and Building Character is a certified installer for both. At your consultation we usually show those next to Trex Signature or Lineage and Deckorators Voyage, so you can see the whole premium tier in one sitting.
All deck boards warm up in direct sun, and dark colors get warmer than light ones. On a south- or west-facing deck, or around a pool, we suggest lighter shades and bring samples you can leave in the sun and touch.
Texture varies from one PVC line to the next, and any deck surface calls for care when it is wet or icy. Around a pool or on stairs we compare the grain and finish of a few lines with you, using samples you can test with a wet hand, before you pick one.
Most of the time, warm water, mild soap and a soft brush are enough. In shady spots, a spring rinse clears pollen and the light film that collects. Check the manufacturer’s care guide before using any stronger cleaner, and skip the sanding and staining entirely.
It can work, provided the old framing is still sound and was laid out on the joist centers your PVC line needs. Our crew looks over the ledger connection, every post and joist, and the footings before quoting a re-deck. When the structure falls short, we say exactly what is wrong and show you the cost of fixing it next to the cost of new framing.
Most will. Ohio requires a permit for any deck attached to a house, and the rules across the river in Kentucky and Indiana work much the same way. Our office handles the drawings, the application and every inspection visit, and the cost is built into your proposal.
Building usually runs one to three weeks after permit approval. A second-story deck, a complicated inlay or a stretch of bad weather can lengthen that, and your proposal gives you a schedule for your specific deck.
Yes, through Hearth, with 13 lenders and loans up to $100,000. You can pre-qualify in under two minutes with a soft credit check, and there are no prepayment penalties. Eligibility and exact terms are confirmed before work is scheduled.