A retaining wall holds back the weight of soil and the water inside it, so most of the work sits below and behind the face you see. We dig a trench for the base, place and compact a gravel footing so the first course sits level, and bury that course partly below grade. Behind the wall goes clean, free-draining gravel with a perforated pipe at the bottom that carries water to daylight or another outlet, so it can leave instead of pressing on the wall. Filter fabric keeps fine soil from clogging the gravel. Taller walls may call for reinforcement grid layered into the backfill, and whether a given wall needs a permit or an engineered design is confirmed with the local building department before we start.
Segmental block and poured concrete do most of the heavy work. Interlocking wall block is made for this job, comes in many textures and colors, and handles curves and steps well. A poured concrete wall gives a clean, modern face and can carry reinforcement for heavier loads, though it needs forms and a pour on site. Natural stone and brick give a traditional look; stone takes longer to fit, and brick usually sits on a concrete footing. Boulders suit a rugged, stacked look on a slope but need heavy equipment to set. Wood walls cost less up front and feel warm, but they need upkeep and are not suited to tall walls. Gabion baskets filled with stone drain freely and read as contemporary.
A wall is usually doing a job for something else in the yard. It can level the ground for a
stone or paver patio, carve out a flat spot under a
hillside deck, or carry steps between terraces. The cap can be widened into a seating wall, planting pockets can be built into the face, low-voltage lights can be tucked under the cap, and a small waterfall can run down the front.
Design, permits and construction are included. Each wall is drawn and modeled in 3D before excavation, and on steep or slide-prone ground we plan for the geotechnical and engineering review the site calls for. Inside City of Cincinnati Hillside Overlay Districts, that means the required geotechnical pre-consultation comes first.